Project cargo · Out of gauge · Heavy lift
Difficult loads,planned properly.
Skids, transformers, pipe spools and crates that don't fit a standard box. Drop in the packing list, however messy, and see the flat racks, open tops and containers it needs, with every out-of-gauge figure flagged before you book.

What makes a load difficult
Wider than a box door or a flat rack's 2.44 m in-gauge width. The planner shows the overhang each side.
Too tall for a high cube or a rack's in-gauge height. Shown in millimetres, with the top height from the ground.
A 24 t piece on 6 m of deck. Checked against the carrier's weight-distribution guideline, not just the payload.
Pipe spools, beams and towers. Placed lengthways, with overhang past the end walls marked.
From a messy packing list to a clean plan
Real packing lists mix inches and millimetres, net and gross, two crates on one line and handwritten notes. Here's how a list like that is read. You check every line before anything is planned.
- Skid w/ compressor unit, 236" x 94" x 102", 18,450 lbs gross
- Crate 2/3 & 3/3 spares, 1800x1200x1100mm, 1,250 kg ea
- Pipe spools (bundle) L=11.8m W 1.1 H 0.9, NW 2,900, GW 3,150 kg
- Control cabinet 120 x 80 x 210 cm, 640kg, FRAGILE, THIS WAY UP
- Heat exchanger 6.40m x 2.65m x 2.95m, approx 24 t
+ 1 pallet loose bolts ~400kg
| Piece | Qty | L × W × H (m) | kg each |
|---|---|---|---|
| Compressor skidinches and lbs converted | 1 | 5.994 × 2.388 × 2.591 | 8,369 |
| Crate, sparestwo crates on one line: qty 2 | 2 | 1.8 × 1.2 × 1.1 | 1,250 |
| Pipe spool bundlegross used, net ignored | 1 | 11.8 × 1.1 × 0.9 | 3,150 |
| Control cabinetupright only | 1 | 1.2 × 0.8 × 2.1 | 640 |
| Heat exchanger"approx" weight: confirm it | 1 | 6.4 × 2.65 × 2.95 | 24,000 |
| Pallet, loose boltsno dimensions: add them | 1 | missing | 400 |
Illustration of how the figures are read and flagged. Amber means please check; red means a figure is missing and the plan waits for it.
Open the five complete lines (6 pieces) in the planner →
The pallet of loose bolts is left out: it has no dimensions yet, so add them in the planner.
What you get
General purpose, high cube, open top or flat rack, with the fewest units first. Pieces too big for any unit are flagged as breakbulk.
Over-width, over-height, floor load and payload, each with the figure and the limit it was checked against.
Lashings per piece by the CTU Code method, marked as an estimate for the carrier or surveyor to confirm. It follows after launch.
Rotate the load, then top, side and end views drawn to scale for the line's OOG desk.
Every unit, every piece and every check, with your logo at the top if you add it.
Lists are read, then deleted. How we handle your files.
For guidance only. Out-of-gauge and heavy-lift moves need the carrier's acceptance and, where required, a lashing plan signed off by a competent person.