LASHED & SECURED3D load planning
Out-of-gauge cargo
Shipping terms

Shipping terms and abbreviations

Laycan, WIBON, MSL, VGM… The shorthand of shipping and project cargo in plain English, with a real example of each and a link to the right tool. Common mix-ups sets easily confused pairs side by side.

Common mix-ups

CFR vs CIF Same freight, different insuranceUnder both, the seller pays sea freight to the destination port, and risk passes to the buyer once the goods are on…

Mix-ups

Under both, the seller pays sea freight to the destination port, and risk passes to the buyer once the goods are on board at the loading port. Under CIF the seller must also insure the goods for the buyer, at least to Institute Cargo Clauses (C). Under CFR the buyer arranges its own cover. Both are for sea and inland waterway only.

CFR Mombasa: the buyer insures the voyage. CIF Mombasa: the seller buys at least ICC (C) cover for the buyer.

Related: CFR CIF FOB Incoterms

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

Charter vs container demurrage One word, two different chargesIn a charter party, demurrage is the agreed sum the charterer pays the owner for keeping the ship beyond its laytime.

Mix-ups

In a charter party, demurrage is the agreed sum the charterer pays the owner for keeping the ship beyond its laytime. In container shipping, demurrage is what the line charges for a full box left in the terminal beyond its free time. Different contract, different payer, different basis.

A ship 10 hours over laytime at US$18,000 per day pro rata, against a container 3 days past free time at an example rate of US$100 per day.

Related: Demurrage Demurrage (container) Laytime Free time PDPR

Source: BIMCO; The Baltic Exchange; Maersk · checked 27 Oct 2026 · Full page →

CPT vs CIP Carriage paid, with or without insuranceUnder CPT (Carriage Paid To) the seller pays carriage to the named destination, but risk passes when the goods are…

Mix-ups

Under CPT (Carriage Paid To) the seller pays carriage to the named destination, but risk passes when the goods are handed to the first carrier. CIP is the same, and the seller must also insure the goods, to Institute Cargo Clauses (A) under the 2020 rules. Both work for any mode, including containers and air.

CPT Dubai airport: the UK seller pays the air freight, but loss in transit falls on the buyer. Under CIP the buyer can claim on the insurance the seller bought.

Related: CPT CIP CFR CIF FCA

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

Demurrage vs detention Container inside the terminal vs outside itFor containers, demurrage is charged while a full box stays in the terminal beyond its free time.

Mix-ups

For containers, demurrage is charged while a full box stays in the terminal beyond its free time. Detention is charged while the line's box is outside the terminal, with the customer, beyond its free time. Some lines give one combined D&D allowance instead of two.

Free time 4 days in the terminal and 4 days outside. The box stays 6 days in the terminal and 7 days with the customer.

Related: Demurrage (container) Detention Free time Gate in / gate out

Source: Maersk; DP World glossary · checked 27 Oct 2026 · Full page →

Gross weight vs VGM Cargo weight vs the weighed packed containerThe gross weight of the cargo is the goods with their packing.

Mix-ups

The gross weight of the cargo is the goods with their packing. The VGM is the total mass of the packed container: cargo, packing, dunnage, securing material and the container's own tare. The VGM must be sent to the carrier before loading.

A 20' with 14,200 kg of packed cargo, 350 kg of dunnage and lashings and a 2,250 kg tare.

Related: VGM Tare Max gross Payload

Open the VGM calculator →

Source: IMO; GOV.UK · checked 27 Oct 2026 · Full page →

Laycan vs laytime When the ship must arrive, and how long cargo work may takeLaycan is a window of dates: the ship must be ready to load inside it, or the charterer may cancel.

Mix-ups

Laycan is a window of dates: the ship must be ready to load inside it, or the charterer may cancel. Laytime is an allowance of time: how long the charterer has to load or discharge before demurrage starts. A ship can arrive well inside the laycan and still run over its laytime.

Laycan 10–15 Nov, laytime 48 hours SHINC. The ship is ready on 12 Nov, so there is no right to cancel. Laytime starts 12 Nov 14:00 and runs out 14 Nov 14:00.

Related: Laycan Laytime Cancelling date NOR Demurrage

Source: The Baltic Exchange; BIMCO; West of England P&I Club · checked 27 Oct 2026 · Full page →

LC vs WLL Lashing rating vs lifting ratingLC is the rating of a lashing for securing cargo, marked on its label under EN 12195-2.

Mix-ups

LC is the rating of a lashing for securing cargo, marked on its label under EN 12195-2. WLL is the rating of a lifting item for lifting. They come from different standards and tests. A lashing's LC is never a lifting rating: do not lift with a lashing strap, and the label says so.

A strap marked LC 2,500 daN (about 2.5 t) must not be used as a 2.5 t lifting sling. For the lift, use a sling marked with its WLL and with a current thorough examination (every 6 months, unless a competent person's examination scheme sets another interval).

Related: LC WLL SWL Sling MSL

Open the Load Planner →

Source: Dolezych; European Commission, DG MOVE; LEEA; Health and Safety Executive · checked 27 Oct 2026 · Full page →

MBL vs MBL Master bill of lading vs minimum breaking loadIn shipping documents, MBL means master bill of lading, the shipping line's B/L.

Mix-ups

In shipping documents, MBL means master bill of lading, the shipping line's B/L. In rigging and lashing, MBL means minimum breaking load, the force at which an item is expected to break. Read the context: a booking or arrival notice means the bill; a certificate or label means the strength.

"MBL 200 kN" on a chain certificate is a strength. "MBL no. ABCD123456" on an arrival notice is a bill.

Related: Breaking load MSL House B/L

Source: US Federal Maritime Commission; Netherlands Regulatory Framework · checked 27 Oct 2026 · Full page →

MSL vs breaking load Allowed load vs the load that breaks itBreaking load is the force at which a lashing or fitting is expected to fail.

Mix-ups

Breaking load is the force at which a lashing or fitting is expected to fail. MSL is the much lower force it may take in service at sea, set as a share of the breaking load under the CSS Code. Securing plans use MSL, never breaking load.

A chain lashing with a breaking load of 200 kN.

Related: MSL Breaking load CS CSS Code

Open the Load Planner →

Source: Netherlands Regulatory Framework · checked 27 Oct 2026 · Full page →

OOG vs breakbulk Too big for the box vs shipped without a boxOOG cargo still travels on container equipment, usually a flat rack or open top, but sticks out past the normal…

Mix-ups

OOG cargo still travels on container equipment, usually a flat rack or open top, but sticks out past the normal container size. Breakbulk is loaded piece by piece into the ship with no container. A large piece can go either way, depending on its size, its weight and the ships on the route.

A 3.2 m wide machine on a 40' flat rack is OOG (over-width). The same machine lifted straight into an MPP's hold is breakbulk.

Related: OOG Breakbulk Flat rack Over-width

Try Will it fit? →

Source: Maersk; Port of Tauranga; Port of Brownsville · checked 27 Oct 2026 · Full page →

Payload vs concentrated load Total weight limit vs weight on a short lengthPayload is the most cargo the whole unit may carry when the weight is spread out.

Mix-ups

Payload is the most cargo the whole unit may carry when the weight is spread out. A concentrated load puts the weight on a short length or small area, and the weight allowed then drops. A piece can be under the payload and still too heavy for the floor under it.

A 24,000 kg piece on two skids each 1.0 m long, in a unit with a 30,000 kg payload.

Related: Payload Point load Load spreading Flat rack

Try Will it fit? →

Source: Hapag-Lloyd; UK P&I Club · checked 27 Oct 2026 · Full page →

POD vs POD Port of discharge vs proof of deliveryOn a booking or B/L, POD is the port of discharge, where the cargo leaves the last sea-going ship.

Mix-ups

On a booking or B/L, POD is the port of discharge, where the cargo leaves the last sea-going ship. On delivery paperwork, POD is the proof of delivery, the receipt the receiver signs. The first is a place; the second is a document.

"POD Jebel Ali" on a booking is a port. "Please send the POD" from a buyer means the signed delivery receipt.

Related: POD Proof of delivery Place of delivery POL

Source: Digital Container Shipping Association; DP World glossary · checked 27 Oct 2026 · Full page →

Tare vs payload vs max gross The empty box, the cargo allowed, and the totalTare is the weight of the empty container.

Mix-ups

Tare is the weight of the empty container. Payload is the most cargo it may carry. Max gross is the most the box and its cargo may weigh together, shown on the CSC plate. So payload = max gross − tare. Road limits on the way may be lower.

A 20' with a max gross of 30,480 kg and a tare of 2,250 kg.

Related: Tare Payload Max gross VGM CSC plate

Try Will it fit? →

Source: Shapiro; IMO, ILO and UNECE · checked 27 Oct 2026 · Full page →

A

AAAA Always afloat, always accessibleThe berth must be one where the ship stays afloat at all states of tide and can always reach and leave.

Chartering

The berth must be one where the ship stays afloat at all states of tide and can always reach and leave.

"1 SB AAAA" means one safe berth, always afloat, always accessible.

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

Accompanied / unaccompanied Ro-ro freight with or without a driverAccompanied ro-ro freight travels with its truck and driver.

Road

Accompanied ro-ro freight travels with its truck and driver. Unaccompanied trailers go on the ferry alone and are collected by another haulier at the far port.

Unaccompanied trailers from Rotterdam to Purfleet cut driver costs.

Related: RORO ENS

Source: GOV.UK · checked 27 Oct 2026 · Full page →

ADR Agreement concerning the international carriage of dangerous goods by roadThe UNECE agreement setting the rules for dangerous goods by road.

Dangerous goods

The UNECE agreement setting the rules for dangerous goods by road. "European" was dropped from its title from 2021. GB applies it to domestic journeys too.

A tanker of diesel needs ADR placards, a trained driver and the right equipment.

Related: DG DGSA IMDG Code

Read the DG by sea guide →

Source: UNECE; GOV.UK · checked 27 Oct 2026 · Full page →

AEO Authorised Economic OperatorA customs status for businesses with trusted, secure supply chains.

Customs & documents

A customs status for businesses with trusted, secure supply chains. It can mean fewer checks and simpler procedures.

An AEO-certified forwarder gets faster clearance at some borders.

Related: Customs broker EORI

Source: GOV.UK · checked 27 Oct 2026 · Full page →

AIL Abnormal indivisible loadA load that cannot be split into two or more loads for road transport, and that is over normal size or weight limits.

Road

A load that cannot be split into two or more loads for road transport, and that is over normal size or weight limits. It can move under special rules.

A 95 t transformer is an AIL; a trailer of 95 t of steel beams is not.

Related: STGO ESDAL VR1 Special Order

Source: GOV.UK; National Highways · checked 27 Oct 2026 · Full page →

Air draft Air draught: height above the waterlineThe height from the waterline to the highest fixed point of the ship.

Chartering

The height from the waterline to the highest fixed point of the ship. It must clear bridges and overhead lines on the route, so it is checked against the real clearances, never assumed.

A heavy-lift ship with tall deck cargo checks its air draft against each bridge before a river passage.

Related: Draft LOA

Source: Wärtsilä Encyclopedia of Ship Technology; US Coast Guard · checked 27 Oct 2026 · Full page →

Apron Quay apronThe open area of a quay next to the ship, where cargo is landed and cranes work.

Breakbulk & ports

The open area of a quay next to the ship, where cargo is landed and cranes work.

Pieces are set down on the apron and moved to the laydown area.

Related: Quay

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

ATA Carnet Admission Temporaire / Temporary Admission carnetAn international customs document for taking goods abroad temporarily, such as exhibition stands, samples or…

Customs & documents

An international customs document for taking goods abroad temporarily, such as exhibition stands, samples or professional equipment, without paying duty in each country.

A survey team takes its test equipment to Norway and back on an ATA Carnet.

Related: COO Customs declaration

Read the ATA Carnet guide →

Source: London Chamber of Commerce and Industry; GOV.UK · checked 27 Oct 2026 · Full page →

ATS All time savedDespatch counted on all the time saved, from the end of cargo work to when laytime would have expired.

Chartering

Despatch counted on all the time saved, from the end of cargo work to when laytime would have expired. Weekends and holidays in that period count too.

Finishing on Friday evening with laytime ending Monday: ATS counts the weekend.

Related: WTS Despatch DHDATSBE

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Attendant Abnormal load attendantA person who travels with an abnormal load to warn other road users, required for wide, long or overhanging loads.

Road

A person who travels with an abnormal load to warn other road users, required for wide, long or overhanging loads.

A 3.8 m wide load needs an attendant (over 3.5 m).

Related: AIL

Source: GOV.UK · checked 27 Oct 2026 · Full page →

ATUTC Actual time used to countOnly the time actually spent working counts as laytime in a given period.

Chartering

Only the time actually spent working counts as laytime in a given period.

"Saturday afternoons excepted, ATUTC."

Related: UUIWCATUTC

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

Average laytime To average laytimeLoading and discharge time are calculated separately, then time saved at one end is set against time lost at the other.

Chartering

Loading and discharge time are calculated separately, then time saved at one end is set against time lost at the other.

One day saved loading cancels one day over at discharge, so no demurrage is due.

Related: Reversible Laytime Demurrage

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Axle load Weight per axleThe share of the total weight carried by each axle line.

Project & heavy lift

The share of the total weight carried by each axle line. Roads, bridges, ramps and quays all have axle-load limits.

150 t on a 12-axle trailer is about 12.5 t per axle, before the tractor.

Related: STGO

Source: GOV.UK · checked 27 Oct 2026 · Full page →

B

BAF Bunker adjustment factorA surcharge that moves with the price of ship fuel, so the base freight rate can stay fixed.

Surcharges

A surcharge that moves with the price of ship fuel, so the base freight rate can stay fixed. Carriers also call it a bunker or fuel surcharge.

Maersk works out BAF as a trade factor (tonnes of fuel per box) times the quarterly fuel price.

Related: Bunkers LSS EBS EU ETS surcharge

Read the bunker surcharge guide →

Source: Maersk; Marine Insight; Lashed & Secured · checked 27 Oct 2026 · Full page →

Ballast Weight for stability, or sailing emptyWater carried in tanks to keep a ship stable and at the right trim.

Chartering

Water carried in tanks to keep a ship stable and at the right trim. "In ballast" also means sailing without cargo.

A heavy-lift ship takes on ballast to stay upright while its cranes swing a 400 t lift outboard.

Related: Stability

Source: Port of Tauranga; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Bareboat charter Demise charterThe charterer takes over the ship almost as if they owned it, with their own crew, insurance, repairs and running costs.

Chartering

The charterer takes over the ship almost as if they owned it, with their own crew, insurance, repairs and running costs. The owner just receives hire.

An offshore contractor bareboat charters a crane barge for five years and puts its own crew on board.

Related: Time charter Charter party Hire

Source: Marine Insight; Azmi & Associates, via AmCham Malaysia · checked 27 Oct 2026 · Full page →

Basic ocean freight BASThe base sea freight for moving the container from port to port, before surcharges.

Surcharges

The base sea freight for moving the container from port to port, before surcharges.

BAS plus BAF, THC and fees makes up the all-in rate.

Related: BAF THC

Source: Marine Insight · checked 27 Oct 2026 · Full page →

Belly cargo Cargo on passenger flightsCargo carried in the lower-deck holds of passenger aircraft.

Air freight

Cargo carried in the lower-deck holds of passenger aircraft. It is a big share of world air freight capacity.

Fresh fish flown as belly cargo on a daily passenger service.

Related: Freighter

Try Will it fit? (aircraft and ULDs) →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

Berth BerthThe place in a port where a ship lies to load or discharge, such as a quay, wharf, jetty or buoy.

Breakbulk & ports

The place in a port where a ship lies to load or discharge, such as a quay, wharf, jetty or buoy.

Berth 7 has a 200 t mobile harbour crane and 12 m of water.

Related: Quay

Source: BIMCO; Port of Brownsville · checked 27 Oct 2026 · Full page →

BIC code Container owner code (ISO 6346)The four-letter prefix on a container number that identifies the owner or operator, followed by six digits and a…

Containers

The four-letter prefix on a container number that identifies the owner or operator, followed by six digits and a check digit. BIC in Paris keeps the register.

In MSCU 123456 7, "MSC" is the owner code and "U" marks a freight container.

Source: Bureau International des Containers · checked 27 Oct 2026 · Full page →

BIMCO Baltic and International Maritime CouncilThe largest international shipping association.

Chartering

The largest international shipping association. It publishes standard contracts and clauses such as GENCON, HEAVYCON and the Laytime Definitions.

Using a BIMCO form means both sides already know how most clauses will be read.

Related: HEAVYCON Laytime

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

B/L Bill of lading (BOL)The document a sea carrier issues for cargo.

Customs & documents

The document a sea carrier issues for cargo. It is a receipt for the goods, evidence of the contract of carriage and, if negotiable, a document of title: the holder of an original can claim the cargo.

The bank releases the original B/L to the buyer once the letter of credit is paid.

Related: Sea waybill House B/L Clean B/L LOI

Open the Document Reader →

Source: Azmi & Associates, via AmCham Malaysia; West of England P&I Club; Port of Brownsville · checked 27 Oct 2026 · Full page →

Blank sailing Cancelled sailing or skipped port callA line cancels a scheduled sailing or skips a port on its loop, often when demand is low or a port is disrupted.

Containers

A line cancels a scheduled sailing or skips a port on its loop, often when demand is low or a port is disrupted. Cargo booked on it moves to a later sailing, often a week or more later.

A line blanks the sailing in the week after Chinese New Year, so boxes wait for the next week's ship.

Related: Rolled cargo Liner service

Source: Marine Insight · checked 27 Oct 2026 · Full page →

B/L fee Documentation feeAn admin charge per bill of lading (not per container).

Surcharges

An admin charge per bill of lading (not per container). Some countries also have origin or destination documentation fees.

One B/L fee is charged per bill, whether it covers 1 container or 10.

Related: B/L THC

Source: Marine Insight · checked 27 Oct 2026 · Full page →

Blocking Blocking and bracingStopping cargo moving by placing it against something solid: the container walls, other cargo, timber or chocks.

Project & heavy lift

Stopping cargo moving by placing it against something solid: the container walls, other cargo, timber or chocks. Bracing uses struts to the same end.

Timber blocks nailed to the floor stop a crate sliding forward.

Related: Lashing Form locking Dunnage

Open the Load Planner →

Source: IMO, ILO and UNECE · checked 27 Oct 2026 · Full page →

Bonded warehouse Customs warehouseA store approved by customs where imported goods can be held with duty suspended until they are released.

Breakbulk & ports

A store approved by customs where imported goods can be held with duty suspended until they are released.

Spare parts kept in bond and duty paid only when each part is taken out.

Related: Duty Free zone

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

Breakbulk Break-bulk cargoGeneral cargo shipped as separate pieces, not in containers and not loose in bulk: crates, steel, timber, vehicles,…

Breakbulk & ports

General cargo shipped as separate pieces, not in containers and not loose in bulk: crates, steel, timber, vehicles, machinery and bagged goods.

Steel beams, crated machinery and a boiler loaded piece by piece into an MPP's hold.

Related: Bulk cargo Project cargo

Open the Load Planner →

Source: Port of Tauranga; Port of Brownsville · checked 27 Oct 2026 · Full page →

Breaking load BL or MBL: minimum breaking loadThe force at which a lashing or fitting is expected to break.

Project & heavy lift

The force at which a lashing or fitting is expected to break. The MSL and SWL are set well below it.

A chain with a 200 kN breaking load has an MSL of 100 kN under the CSS Code table.

Related: MSL SWL

Open the Load Planner →

Source: Netherlands Regulatory Framework · checked 27 Oct 2026 · Full page →

BT-BT Berth term to berth termThe carrier pays for loading, discharge and securing, and these costs are in the freight.

Chartering

The carrier pays for loading, discharge and securing, and these costs are in the freight. Common on liner breakbulk services.

A breakbulk quote "BT-BT Hamburg to Houston" includes stevedoring at both ends.

Related: FIO

Source: MOL Logistics; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Bulk cargo Dry or liquid bulkLoose cargo loaded straight into holds or tanks, such as grain, coal, ore or oil.

Breakbulk & ports

Loose cargo loaded straight into holds or tanks, such as grain, coal, ore or oil. It is handled by grabs, conveyors or pumps.

Iron ore loaded at 10,000 t an hour by conveyor.

Related: Breakbulk DWT

Source: Port of Tauranga; Port of Brownsville · checked 27 Oct 2026 · Full page →

Bunkers Ship's fuelThe fuel a ship burns.

Chartering

The fuel a ship burns. The name comes from the old coal bunkers. Bunker prices drive the BAF on freight invoices.

Bunkering in Singapore before the long leg to Rotterdam.

Related: BAF VLSFO

Source: The Baltic Exchange; Lashed & Secured · checked 27 Oct 2026 · Full page →

C

Cabotage Domestic shippingCarrying goods between two ports in the same country.

Breakbulk & ports

Carrying goods between two ports in the same country. Many countries reserve it for their own ships.

A foreign ship may not be allowed to carry cargo between two US ports.

Related: Transhipment

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

CAF Currency adjustment factorA surcharge to cover exchange-rate swings between the currency of the freight and the carrier's local costs.

Surcharges

A surcharge to cover exchange-rate swings between the currency of the freight and the carrier's local costs.

A CAF of a few percent added to freight quoted in euros.

Related: BAF THC

Source: Marine Insight · checked 27 Oct 2026 · Full page →

Canal surcharge Suez or Panama canal transit feeA per-container charge to cover canal tolls on routes through the Suez or Panama Canal.

Surcharges

A per-container charge to cover canal tolls on routes through the Suez or Panama Canal.

A Suez transit fee per box on an Asia to Europe sailing.

Related: BAF

Read the shipping guides →

Source: Marine Insight · checked 27 Oct 2026 · Full page →

Cancelling date Last day of the laycanThe last date by which the ship must be ready under the charter.

Chartering

The last date by which the ship must be ready under the charter. If it is not, the charterer has an option to cancel. Cancelling is a choice, not automatic, and it does not on its own give the charterer a right to damages.

Laycan 10–15 May: if the ship cannot be ready by 15 May, the charterer may cancel or keep the ship.

Related: Laycan NOR

Source: West of England P&I Club; HandyBulk · checked 27 Oct 2026 · Full page →

CAO Cargo aircraft onlyDangerous goods allowed only on freighters, not passenger aircraft.

Air freight

Dangerous goods allowed only on freighters, not passenger aircraft. Packages carry the orange CAO label and it is shown on the declaration.

Lithium-ion batteries shipped on their own (UN 3480) must go CAO.

Related: Freighter DGR DGD

Read the DG by air guide →

Source: Lashed & Secured; IATA · checked 27 Oct 2026 · Full page →

Cargo securing manual CSMA manual on board each relevant ship that sets out how cargo is to be secured on that ship, including its fixed…

Project & heavy lift

A manual on board each relevant ship that sets out how cargo is to be secured on that ship, including its fixed securing points and portable gear with their MSLs.

The chief officer checks the lashing plan against the ship's cargo securing manual.

Related: CSS Code MSL

Source: Netherlands Regulatory Framework; Skuld · checked 27 Oct 2026 · Full page →

CDS Customs Declaration ServiceHMRC's system for UK import and export declarations.

Customs & documents

HMRC's system for UK import and export declarations. Each declaration gets a movement reference number (MRN).

The export declaration on CDS returns an MRN for the haulier.

Related: Customs declaration GVMS

Read the import and export basics →

Source: GOV.UK · checked 27 Oct 2026 · Full page →

Certificate of approval CoA (marine warranty)The document a marine warranty surveyor issues when satisfied an operation is acceptable.

Project & heavy lift

The document a marine warranty surveyor issues when satisfied an operation is acceptable. It names the operation and equipment, and any conditions.

No CoA, no sailaway: the tow waits until the MWS signs.

Related: MWS

Source: Skuld · checked 27 Oct 2026 · Full page →

CFR Cost and FreightThe seller pays freight to the destination port, but risk passes when the goods are on board at the loading port.

Incoterms

The seller pays freight to the destination port, but risk passes when the goods are on board at the loading port. Sea and inland waterway only.

"CFR Jebel Ali": the buyer insures the sea voyage.

Related: CIF FOB Incoterms

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

CFS Container freight stationA warehouse where LCL cargo is packed into (stuffed) or unpacked from (stripped) containers.

Containers

A warehouse where LCL cargo is packed into (stuffed) or unpacked from (stripped) containers.

LCL cargo must reach the CFS three working days before the sailing.

Related: LCL Stuffing Consolidation

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

Chargeable weight The weight air freight is charged onThe higher of the actual gross weight and the volumetric weight.

Air freight

The higher of the actual gross weight and the volumetric weight. Light, bulky cargo is charged by its size.

A 100 × 60 × 30 cm box weighing 20 kg is charged as 30 kg.

Related: Volumetric weight

Work out chargeable weight →

Source: Maersk · checked 27 Oct 2026 · Full page →

Charter party C/P or CPThe contract between a shipowner and a charterer to hire a ship, either for a voyage or for a period of time.

Chartering

The contract between a shipowner and a charterer to hire a ship, either for a voyage or for a period of time. It sets the freight or hire, the ports, the laytime and who pays for what.

"As per C/P dated 3 March" means the terms in that signed charter apply.

Related: Voyage charter Time charter Bareboat charter

Source: The Baltic Exchange; Marine Insight · checked 27 Oct 2026 · Full page →

CIF Cost, Insurance and FreightAs CFR, and the seller also insures the goods, at Institute Cargo Clauses (C) level by default.

Incoterms

As CFR, and the seller also insures the goods, at Institute Cargo Clauses (C) level by default. Sea and inland waterway only.

"CIF Mombasa, Incoterms 2020".

Related: CFR CIP Incoterms

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

CIP Carriage and Insurance Paid ToAs CPT, and the seller must also insure the goods, at Institute Cargo Clauses (A) level under the 2020 rules.

Incoterms

As CPT, and the seller must also insure the goods, at Institute Cargo Clauses (A) level under the 2020 rules. Any mode.

"CIP Lagos, Incoterms 2020" with all-risks cover.

Related: CPT CIF Incoterms

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

Claused B/L Foul or dirty bill of ladingA bill of lading with remarks that the cargo's condition or quantity was not as described when loaded.

Customs & documents

A bill of lading with remarks that the cargo's condition or quantity was not as described when loaded.

"Wrapping torn, contents exposed" written on the B/L.

Related: Clean B/L

Source: West of England P&I Club · checked 27 Oct 2026 · Full page →

Clean B/L Clean bill of ladingA bill of lading with no remarks about damage or shortage.

Customs & documents

A bill of lading with no remarks about damage or shortage. Banks usually require a clean B/L under a letter of credit.

A B/L noting "2 cases dented" is claused, not clean.

Related: Claused B/L B/L LOI

Source: West of England P&I Club · checked 27 Oct 2026 · Full page →

CMR Convention on the Contract for the International Carriage of Goods by RoadThe international convention for road freight contracts, and the name of its consignment note.

Road

The international convention for road freight contracts, and the name of its consignment note. The CMR note is a receipt and evidence of the contract, but not a document of title.

A trailer from Birmingham to Milan travels on a CMR note in four copies.

Related: B/L Haulier

Source: nibusinessinfo.co.uk · checked 27 Oct 2026 · Full page →

CoG Centre of gravityThe point where a piece's weight acts.

Project & heavy lift

The point where a piece's weight acts. It must be known and marked, so lifting, lashing and stowage keep the piece balanced. An off-centre CoG changes every lashing calculation.

A transformer marked "CoG 1.6 m from the base, 0.3 m off centre".

Related: Lifting points Stability

Open the Load Planner →

Source: Skuld; IMO, ILO and UNECE · checked 27 Oct 2026 · Full page →

Commercial invoice Seller's invoiceThe seller's invoice for the goods.

Customs & documents

The seller's invoice for the goods. Customs uses it for value, description and origin, so it must match the other documents.

The invoice shows 4 pallets, £18,400, Incoterm FCA Felixstowe.

Related: Incoterms

Open the Document Reader →

Source: GOV.UK · checked 27 Oct 2026 · Full page →

Consignee Receiver of the goodsThe party the goods are sent and delivered to, named on the bill of lading or waybill.

Customs & documents

The party the goods are sent and delivered to, named on the bill of lading or waybill. It is often, but not always, the buyer.

The site operator in Aberdeen is consignee and collects the cargo with the delivery order.

Related: Shipper Notify party B/L D/O

Source: Port of Brownsville; ZIM · checked 27 Oct 2026 · Full page →

Consolidation GroupageCombining several shippers' cargo into one container or shipment to share the cost.

Containers

Combining several shippers' cargo into one container or shipment to share the cost. A consolidator or NVOCC arranges it.

Ten small shipments consolidated into one 40' to Lagos.

Related: LCL NVOCC CFS

Source: Port of Brownsville; IATA · checked 27 Oct 2026 · Full page →

Contract rate Rate under a service contractA rate agreed for a period, often a year, in return for a promise of a minimum volume of cargo.

Surcharges

A rate agreed for a period, often a year, in return for a promise of a minimum volume of cargo. On US trades this is a service contract filed with the FMC.

A shipper commits 500 FEU a year on one trade in return for a fixed rate per 40'.

Related: BAF

Source: US Federal Maritime Commission; Marine Insight · checked 27 Oct 2026 · Full page →

COO Certificate of originA document confirming which country the goods come from.

Customs & documents

A document confirming which country the goods come from. Some buyers or countries need it, often issued by a chamber of commerce. Preferential origin under trade deals has its own rules.

The Saudi buyer asks for a chamber-stamped COO with the invoice.

Related: ATA Carnet Commercial invoice

Read the ATA Carnet guide →

Source: GOV.UK · checked 27 Oct 2026 · Full page →

Corner casting Corner fittingThe steel block at each corner of a container, with openings for twistlocks, lifting gear and lashings.

Containers

The steel block at each corner of a container, with openings for twistlocks, lifting gear and lashings. Cranes lift a box by its four top corner castings.

The crane spreader's twistlocks lock into the top corner castings before the box is lifted.

Related: Twistlock Gantry crane CSC plate

Source: Health and Safety Executive; TT Club · checked 27 Oct 2026 · Full page →

CPT Carriage Paid ToThe seller pays carriage to the named destination, but risk passes when the goods are handed to the first carrier.

Incoterms

The seller pays carriage to the named destination, but risk passes when the goods are handed to the first carrier. Any mode.

"CPT Dubai airport": risk passes at the UK end.

Related: CIP CFR Incoterms

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

CS Calculated strengthIn the CSS Code Annex 13 method, the strength used in the calculation: the MSL divided by a safety factor, normally 1.5.

Project & heavy lift

In the CSS Code Annex 13 method, the strength used in the calculation: the MSL divided by a safety factor, normally 1.5.

A chain with an MSL of 100 kN counts as 66.7 kN in an Annex 13 check.

Related: MSL CSS Code

Open the Load Planner →

Source: Netherlands Regulatory Framework · checked 27 Oct 2026 · Full page →

CSC plate Convention for Safe Containers safety approval plateThe metal plate on a container, usually on the door, showing it is approved under the CSC.

Containers

The metal plate on a container, usually on the door, showing it is approved under the CSC. It gives the maximum gross mass and stacking limits.

A box with no CSC plate should not be used in international traffic.

Related: Max gross Tare

Source: IMO, ILO and UNECE · checked 27 Oct 2026 · Full page →

CSS Code Code of Safe Practice for Cargo Stowage and SecuringThe IMO code for stowing and securing cargo on ships, other than bulk cargoes.

Project & heavy lift

The IMO code for stowing and securing cargo on ships, other than bulk cargoes. It covers containers as well as non-standard cargo: Annex 1 deals with containers on ships not built for them and Annex 14 with safe working conditions for securing containers on deck. Its Annex 13 gives a method to check lashings of non-standard cargo against sea forces.

Breakbulk lashings checked with the CSS Code Annex 13 method.

Related: MSL CS Cargo securing manual CTU Code

Open the Load Planner →

Source: IMO; Netherlands Regulatory Framework · checked 27 Oct 2026 · Full page →

CTU Cargo transport unitAny unit cargo is packed into for transport: a container, swap body, trailer, road vehicle or rail wagon.

Containers

Any unit cargo is packed into for transport: a container, swap body, trailer, road vehicle or rail wagon.

Under the CTU Code, a curtainsider trailer is a CTU too.

Related: CTU Code Swap body

Open the Load Planner →

Source: IMO, ILO and UNECE · checked 27 Oct 2026 · Full page →

CTU Code Code of Practice for Packing of Cargo Transport UnitsThe IMO/ILO/UNECE guidance on packing and securing cargo in containers, trailers, wagons and swap bodies.

Containers

The IMO/ILO/UNECE guidance on packing and securing cargo in containers, trailers, wagons and swap bodies. It covers weights, securing, documents and safety.

Lashing a crate to the lashing rings of a 20' following the CTU Code.

Related: CTU MSL Blocking Lashing

Open the Load Planner →

Source: IMO, ILO and UNECE · checked 27 Oct 2026 · Full page →

C&U Construction and Use RegulationsThe Road Vehicles (Construction and Use) Regulations 1986, which set normal vehicle limits.

Road

The Road Vehicles (Construction and Use) Regulations 1986, which set normal vehicle limits. Loads beyond them may move under STGO.

Under C&U, a load over 2.9 m wide (up to 4.3 m) needs 2 clear working days' notice to police.

Related: STGO AIL

Source: National Highways · checked 27 Oct 2026 · Full page →

Customs broker Customs agentA company you appoint to make customs declarations for you, as your direct or indirect representative.

Customs & documents

A company you appoint to make customs declarations for you, as your direct or indirect representative.

The broker clears the import on CDS and sends you the duty bill.

Related: Customs declaration Freight forwarder

Read the import and export basics →

Source: GOV.UK; Port of Brownsville · checked 27 Oct 2026 · Full page →

Customs declaration Import or export entryThe formal statement to customs of what goods are, their value, origin and commodity code, so duty and controls can…

Customs & documents

The formal statement to customs of what goods are, their value, origin and commodity code, so duty and controls can apply.

The broker makes an import declaration on CDS for the container.

Related: CDS EORI Customs broker

Read the import and export basics →

Source: GOV.UK · checked 27 Oct 2026 · Full page →

CY Container yardThe area at a terminal or depot where full and empty containers are stored before loading or after discharge.

Containers

The area at a terminal or depot where full and empty containers are stored before loading or after discharge.

Full boxes wait in the container yard for the ship.

Related: FCL CFS Depot

Source: Port of Brownsville; Port of Tauranga · checked 27 Oct 2026 · Full page →

D

DAP Delivered at PlaceThe seller delivers to the named place, ready for unloading.

Incoterms

The seller delivers to the named place, ready for unloading. The buyer unloads and clears import. Any mode.

"DAP buyer's site, Aberdeen".

Related: DPU DDP Incoterms

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

DDP Delivered Duty PaidThe seller delivers to the named place, cleared for import with duties paid, ready for unloading.

Incoterms

The seller delivers to the named place, cleared for import with duties paid, ready for unloading. The most the seller can take on. Any mode.

"DDP Rotterdam warehouse": the seller pays Dutch import VAT and duty.

Related: DAP Duty Incoterms

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

Deadfreight DDFRT: freight on space not usedFreight the charterer still pays when they ship less cargo than agreed, for the empty space.

Chartering

Freight the charterer still pays when they ship less cargo than agreed, for the empty space.

Agreed 30,000 t but only 28,500 t loaded: deadfreight is due on 1,500 t, less the owner's saved costs.

Related: Freight

Source: The Baltic Exchange; Azmi & Associates, via AmCham Malaysia · checked 27 Oct 2026 · Full page →

Deck barge Flat-top bargeAn unpowered barge carrying heavy or oversize cargo on its open deck, towed or pushed by a tug.

Project & heavy lift

An unpowered barge carrying heavy or oversize cargo on its open deck, towed or pushed by a tug.

A 600 t module towed on a deck barge from the yard to the site jetty.

Related: FLO-FLO MWS

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

Demurrage DEM: charter party demurrageAn agreed daily sum the charterer pays the owner when loading or discharging takes longer than the laytime.

Chartering

An agreed daily sum the charterer pays the owner when loading or discharging takes longer than the laytime. It is not the same as container demurrage.

"Demurrage US$18,000 per day pro rata" means each extra hour costs 1/24 of that.

Related: Laytime Despatch PDPR Demurrage (container) Once on demurrage

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Demurrage (container) Container demurrageA charge for a full container left at the terminal beyond the free time.

Containers

A charge for a full container left at the terminal beyond the free time. The clock usually runs from discharge until the box leaves the terminal gate.

Customs holds keep a box in port 4 days past free time, so 4 days' demurrage is charged.

Related: Detention Free time Demurrage

Source: Maersk · checked 27 Oct 2026 · Full page →

Depot Empty container depotA site where carriers store, inspect and repair empty containers, and where empties are collected and returned.

Containers

A site where carriers store, inspect and repair empty containers, and where empties are collected and returned.

Collect the empty 20' from the inland depot two days before stuffing.

Related: Detention CY

Source: Port of Tauranga · checked 27 Oct 2026 · Full page →

Despatch DES: despatch moneyAn agreed sum the owner pays the charterer for finishing cargo work before laytime runs out.

Chartering

An agreed sum the owner pays the charterer for finishing cargo work before laytime runs out. It is often set at half the demurrage rate.

"Despatch half demurrage on laytime saved" (DHDLTS) at a demurrage rate of US$12,000 a day gives US$6,000 a day saved.

Related: Demurrage Laytime DHDATSBE ATS WTS

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Detention Container detentionA charge for keeping the carrier's container outside the terminal beyond the free time.

Containers

A charge for keeping the carrier's container outside the terminal beyond the free time. The clock runs from collection until the empty box is returned.

An empty returned 6 days late to the depot attracts 6 days' detention.

Related: Demurrage (container) Free time

Source: Maersk · checked 27 Oct 2026 · Full page →

DG Dangerous goods (hazmat)Goods that can harm people, ships, aircraft or the environment in transport, such as fuels, paints, gases, batteries…

Dangerous goods

Goods that can harm people, ships, aircraft or the environment in transport, such as fuels, paints, gases, batteries and chemicals. They must be classified, packed, labelled and declared under the rules for each mode.

Machine spares with a lithium battery and a can of paint inside are DG.

Related: IMDG Code DGR ADR UN number DG class

Read the DG by sea guide →

Source: GOV.UK; IMO · checked 27 Oct 2026 · Full page →

DG class Hazard class 1 to 9The nine classes of dangerous goods by their main hazard: 1 explosives, 2 gases, 3 flammable liquids, 4 flammable…

Dangerous goods

The nine classes of dangerous goods by their main hazard: 1 explosives, 2 gases, 3 flammable liquids, 4 flammable solids, 5 oxidisers, 6 toxic and infectious, 7 radioactive, 8 corrosive, 9 miscellaneous.

Lithium batteries and dry ice are class 9.

Related: UN number Packing group Subsidiary hazard

Read the DG by sea guide →

Source: Exis Technologies; Lashed & Secured · checked 27 Oct 2026 · Full page →

DGD Dangerous goods declarationThe shipper's signed document declaring the dangerous goods: UN number, name, class, packing group, quantity and more.

Dangerous goods

The shipper's signed document declaring the dangerous goods: UN number, name, class, packing group, quantity and more. By air it is the Shipper's Declaration for Dangerous Goods.

The carrier rejects the booking because the DGD shows the wrong packing group.

Related: DGN Packing certificate UN number

Read the DG by sea guide →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

DGN Dangerous Goods NoteThe UK name for the multimodal dangerous goods form, which combines the shipper's declaration and the container…

Dangerous goods

The UK name for the multimodal dangerous goods form, which combines the shipper's declaration and the container packing certificate. Ports and carriers use it.

The DGN goes to the terminal with the booking.

Related: DGD Packing certificate

Read the DG by sea guide →

Source: Lashed & Secured; Exis Technologies · checked 27 Oct 2026 · Full page →

DGR IATA Dangerous Goods RegulationsThe airline industry's manual for shipping dangerous goods by air.

Air freight

The airline industry's manual for shipping dangerous goods by air. It includes the ICAO Technical Instructions plus airlines' own extra rules, and a new edition comes out each year.

The 67th edition of the DGR applies for 2026.

Related: ICAO TI CAO DGD IMDG Code

Read the DG by air guide →

Source: IATA; Lashed & Secured · checked 27 Oct 2026 · Full page →

DGSA Dangerous goods safety adviserA qualified adviser that most UK businesses carrying, loading or packing dangerous goods by road, rail or inland…

Dangerous goods

A qualified adviser that most UK businesses carrying, loading or packing dangerous goods by road, rail or inland waterway must appoint.

The haulier's DGSA writes an annual report on its DG operations.

Related: ADR DG

Read the DG by sea guide →

Source: GOV.UK · checked 27 Oct 2026 · Full page →

DHDATSBE Despatch half demurrage on all time saved, both endsDespatch is paid at half the demurrage rate, counting all time saved, at both the loading and the discharge port.

Chartering

Despatch is paid at half the demurrage rate, counting all time saved, at both the loading and the discharge port. Variants are DHDWTSBE (working time saved) and DHDLTSBE (laytime saved).

With DHDATSBE, time saved over a Sunday still earns despatch.

Related: Despatch ATS WTS

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

Direct lashing Diagonal, loop or spring lashingLashings fixed between the cargo and the vehicle or ship so they hold against the cargo's movement directly.

Project & heavy lift

Lashings fixed between the cargo and the vehicle or ship so they hold against the cargo's movement directly. Here the lashing's rating (LC on road, MSL at sea) and the lashing angles count.

Four diagonal chains from a skid's lashing points to the trailer, each at 30–45° to the direction of travel.

Related: Tie-down lashing LC MSL Lashing

Open the Load Planner →

Source: European Commission, DG MOVE; Netherlands Regulatory Framework · checked 27 Oct 2026 · Full page →

D/O Delivery orderA document from the carrier or its agent telling the terminal or warehouse to release the cargo to the named party.

Customs & documents

A document from the carrier or its agent telling the terminal or warehouse to release the cargo to the named party. It is usually issued once freight and local charges are paid and the B/L or release is in order.

The haulier shows the D/O at the terminal gate to collect the import container.

Related: B/L Gate in / gate out

Source: DP World glossary · checked 27 Oct 2026 · Full page →

Dockage Berth chargeA port charge on the ship for the berth it uses, usually based on its length and time alongside.

Breakbulk & ports

A port charge on the ship for the berth it uses, usually based on its length and time alongside.

Dockage charged per metre of LOA per 24 hours.

Related: Wharfage LOA

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

DPU Delivered at Place UnloadedThe seller delivers to the named place and unloads the goods there.

Incoterms

The seller delivers to the named place and unloads the goods there. It replaced DAT in 2020. Any mode.

"DPU Port of Tyne laydown area".

Related: DAP Incoterms

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

Draft DraughtThe depth of the ship below the waterline.

Chartering

The depth of the ship below the waterline. It limits which ports and berths the ship can use, and how much cargo it can load.

A berth with 11.5 m of water at low tide cannot take a ship drawing 12.5 m.

Related: DWT

Source: Port of Tauranga; Port of Brownsville; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Dunnage Packing and bedding materialTimber, boards or mats placed under or between cargo to spread weight, raise friction, keep it dry and stop it…

Project & heavy lift

Timber, boards or mats placed under or between cargo to spread weight, raise friction, keep it dry and stop it moving or touching.

Timber dunnage under steel coils lets a forklift get underneath.

Related: Friction Lashing

Open the Load Planner →

Source: Skuld; Port of Tauranga; Port of Brownsville; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Duty Customs duty (import tariff)Tax charged on imported goods, set by the commodity code, origin and value.

Customs & documents

Tax charged on imported goods, set by the commodity code, origin and value. Import VAT is usually charged on top.

Duty at 2% on a customs value of £50,000 = £1,000.

Related: Duty deferment PVA

Open the HS code finder →

Source: GOV.UK; Port of Brownsville · checked 27 Oct 2026 · Full page →

Duty deferment Duty deferment account (DDA)An HMRC account that lets an importer pay duty and import VAT once a month by direct debit, instead of on each shipment.

Customs & documents

An HMRC account that lets an importer pay duty and import VAT once a month by direct debit, instead of on each shipment.

Duties for all October imports are collected on 15 November.

Related: Duty PVA

Read the import and export basics →

Source: GOV.UK · checked 27 Oct 2026 · Full page →

Dwell time Time cargo sits at one placeHow long cargo or a container stays at one place, such as a terminal, before moving on, usually counted in days.

Containers

How long cargo or a container stays at one place, such as a terminal, before moving on, usually counted in days. Long dwell times add cost and slow the whole journey.

In 2021 the ports of Los Angeles and Long Beach announced a fee on containers that dwelt too long on their terminals. It was never charged, because the long-dwelling containers were cleared, and the scheme ended on 24 January 2023.

Related: Demurrage (container) Gate in / gate out

Source: Portcast glossary; Port of Los Angeles · checked 27 Oct 2026 · Full page →

DWT Deadweight tonnageThe total weight a ship can carry down to its summer load line: cargo, fuel, water, stores and crew.

Chartering

The total weight a ship can carry down to its summer load line: cargo, fuel, water, stores and crew. It is not the cargo capacity alone.

A 63,000 DWT bulker might lift about 60,000 t of cargo after fuel and stores.

Related: GRT Draft

Source: Port of Tauranga; Port of Brownsville; The Baltic Exchange · checked 27 Oct 2026 · Full page →

E

e-AWB Electronic air waybillAn air waybill agreed electronically, with no paper copy travelling with the cargo.

Air freight

An air waybill agreed electronically, with no paper copy travelling with the cargo. Forwarder and airline sign one IATA multilateral agreement to use it.

The forwarder sends an FWB message instead of a paper AWB.

Related: FWB

Source: IATA · checked 27 Oct 2026 · Full page →

EBS Emergency bunker surchargeA temporary fuel surcharge added when fuel prices jump suddenly, and removed when they settle.

Surcharges

A temporary fuel surcharge added when fuel prices jump suddenly, and removed when they settle.

An EBS announced at short notice after a spike in fuel prices.

Related: BAF

Read the bunker surcharge guide →

Source: Marine Insight; Lashed & Secured · checked 27 Oct 2026 · Full page →

ECA Emission control areaSea areas with stricter limits on ship emissions, such as 0.10% sulphur fuel.

Surcharges

Sea areas with stricter limits on ship emissions, such as 0.10% sulphur fuel. They include the North Sea, the Baltic, North American coasts and, since 1 May 2025, the Mediterranean.

Ships switch to 0.10% fuel before entering the North Sea ECA.

Related: LSS VLSFO

Read the bunker surcharge guide →

Source: IMO; Lashed & Secured · checked 27 Oct 2026 · Full page →

EIR Equipment interchange receiptA receipt made when a container changes hands, for example at a terminal or depot gate.

Containers

A receipt made when a container changes hands, for example at a terminal or depot gate. It records the box number, date, place and any damage, so it shows who had the box when damage happened.

The driver has a dent noted on the EIR at the depot gate before taking the empty away.

Related: Gate in / gate out Depot Detention

Source: DP World glossary · checked 27 Oct 2026 · Full page →

EmS Emergency scheduleA code in the IMDG Dangerous Goods List pointing to the fire and spillage procedures for the crew.

Dangerous goods

A code in the IMDG Dangerous Goods List pointing to the fire and spillage procedures for the crew.

EmS F-E, S-E for a flammable liquid.

Related: IMDG Code MFAG

Read the DG by sea guide →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

ENS Entry summary declarationSafety and security information about goods, sent before they arrive so they can be risk-assessed.

Customs & documents

Safety and security information about goods, sent before they arrive so they can be risk-assessed. The carrier is legally responsible for it, though others can file it.

For deep-sea containers the ENS must be in 24 hours before loading at the port of departure.

Related: ICS2 S&S GB

Source: GOV.UK · checked 27 Oct 2026 · Full page →

EORI Economic Operators Registration and Identification numberAn ID number businesses need to move goods into or out of the UK and EU and to make customs declarations.

Customs & documents

An ID number businesses need to move goods into or out of the UK and EU and to make customs declarations. GB numbers start "GB", Northern Ireland ones "XI".

Your EORI goes on every customs declaration you make.

Related: Customs declaration CDS AEO

Read the EORI guide →

Source: GOV.UK; Lashed & Secured · checked 27 Oct 2026 · Full page →

ESDAL Electronic Service Delivery for Abnormal LoadsNational Highways' online system for notifying abnormal load moves to police, highway and bridge authorities, and…

Road

National Highways' online system for notifying abnormal load moves to police, highway and bridge authorities, and for applying for VR1 and Special Orders.

The haulier enters the route in ESDAL, which sends notices to each authority.

Related: AIL VR1 Special Order

Source: National Highways · checked 27 Oct 2026 · Full page →

ETA / ETB / ETD Estimated time of arrival / berthing / departurePlanned times for a ship's arrival at port, alongside the berth and departure.

Chartering

Planned times for a ship's arrival at port, alongside the berth and departure. ETC is estimated time of completion of cargo work.

"ETA Felixstowe 14 Nov 06:00, ETB 15 Nov AM".

Related: NOR

Source: The Baltic Exchange · checked 27 Oct 2026 · Full page →

EU ETS surcharge Emissions surcharge (EU Emissions Trading System)A surcharge passing on the cost of EU carbon allowances that carriers must buy for ship emissions on EU voyages.

Surcharges

A surcharge passing on the cost of EU carbon allowances that carriers must buy for ship emissions on EU voyages. It covers 100% of emissions from 2026, and is usually reset each quarter.

ONE's Europe environment surcharge for Oct–Dec 2026: US$110 per 20' dry box from Asia to Europe.

Related: BAF UK ETS FuelEU

Read the bunker surcharge guide →

Source: European Commission; Hapag-Lloyd; Lashed & Secured · checked 27 Oct 2026 · Full page →

Excepted quantity EQVery small amounts of dangerous goods in tiny inner packagings, with even fewer rules than limited quantities.

Dangerous goods

Very small amounts of dangerous goods in tiny inner packagings, with even fewer rules than limited quantities. They carry the EQ mark.

Laboratory samples of a few millilitres shipped as EQ.

Related: Limited quantity

Read the DG by sea guide →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

EXS Exit summary declarationA safety and security declaration for goods leaving Great Britain.

Customs & documents

A safety and security declaration for goods leaving Great Britain. A separate EXS is not needed when a full export declaration already carries the safety and security data.

The export declaration includes the safety and security data, so no separate EXS is lodged.

Related: ENS Customs declaration CDS

Source: GOV.UK · checked 27 Oct 2026 · Full page →

EXW Ex WorksThe seller makes the goods available at its premises, not loaded and not export-cleared.

Incoterms

The seller makes the goods available at its premises, not loaded and not export-cleared. The buyer does everything else. Any mode.

"EXW Sheffield works, Incoterms 2020".

Related: FCA Incoterms

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

F

FAS Free Alongside ShipThe seller delivers the goods, export-cleared, alongside the ship at the named port.

Incoterms

The seller delivers the goods, export-cleared, alongside the ship at the named port. Sea and inland waterway only.

"FAS Antwerp, berth 420" for a heavy-lift piece.

Related: FOB Incoterms

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured; MOL Logistics · checked 27 Oct 2026 · Full page →

FCA Free CarrierThe seller hands the goods, export-cleared, to the buyer's carrier at the named place.

Incoterms

The seller hands the goods, export-cleared, to the buyer's carrier at the named place. Any mode.

"FCA Felixstowe container terminal".

Related: EXW FOB Incoterms

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

FCL Full container loadYou book and pay for a whole container for your own cargo, even if it is not full.

Containers

You book and pay for a whole container for your own cargo, even if it is not full. The box usually goes door to door sealed.

Eighteen pallets of machinery parts shipped FCL in a 40' to avoid handling at a CFS.

Related: LCL CFS CY

Open the Load Planner →

Source: Maersk; Port of Tauranga · checked 27 Oct 2026 · Full page →

Feeder Feeder vessel or serviceA smaller ship that carries containers between a big hub port and smaller ports the main-line ships do not call at.

Containers

A smaller ship that carries containers between a big hub port and smaller ports the main-line ships do not call at.

A feeder brings boxes from Belfast to Rotterdam to join the Asia service.

Related: Transhipment Hub port

Read the shipping guides →

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

FEU Forty-foot equivalent unitA unit equal to one 40' container, or 2 TEU.

Containers

A unit equal to one 40' container, or 2 TEU. Some freight rates are quoted per FEU.

Rate US$2,400 per FEU from Shanghai to Felixstowe.

Related: TEU Forty-foot

See the container guide →

Source: The Baltic Exchange · checked 27 Oct 2026 · Full page →

FHEX Fridays and holidays excludedUsed in countries where Friday is the weekly rest day.

Chartering

Used in countries where Friday is the weekly rest day. Fridays and holidays do not count as laytime. FHINC means they do.

A charter for a Gulf port may say "FHEX" instead of "SHEX".

Related: SHEX SHINC

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

FHL House manifest messageThe electronic list of house shipments inside a consolidation, sent by the forwarder to the airline.

Air freight

The electronic list of house shipments inside a consolidation, sent by the forwarder to the airline. XFHL is the XML version.

An FHL listing 8 HAWBs goes with the FWB for the master.

Related: FWB HAWB MAWB

Source: IATA · checked 27 Oct 2026 · Full page →

FIO Free in and outThe owner does not pay for loading or discharging; the charterer or cargo side does.

Chartering

The owner does not pay for loading or discharging; the charterer or cargo side does. Who pays for stowing and lashing depends on extra letters such as S (stowed) and T (trimmed).

"US$45 per freight tonne FIO" means cargo handling at both ends is extra.

Related: FIOS

Source: The Baltic Exchange; MOL Logistics · checked 27 Oct 2026 · Full page →

FIOS Free in and out, stowedAs FIO, and the owner also does not pay for stowing the cargo in the ship.

Chartering

As FIO, and the owner also does not pay for stowing the cargo in the ship.

Project cargo fixed "FIOS, lashed, secured and dunnaged" puts securing on the cargo side.

Related: FIO

Source: The Baltic Exchange; MOL Logistics · checked 27 Oct 2026 · Full page →

Fixture An agreed charterThe point where owner and charterer have agreed a charter.

Chartering

The point where owner and charterer have agreed a charter. Firm offers settle the main terms first; the deal only binds once every detail is agreed and all subjects are lifted.

"Fixed: 28,000 t steel coils, Antwerp to Houston, laycan 3–8 Dec" in a broker's market report.

Related: Recap Subjects lifted Charter party

Source: The Baltic Exchange; The Shipowners' Club · checked 27 Oct 2026 · Full page →

Flat rack FR containerA container base with end walls but no sides or roof.

Containers

A container base with end walls but no sides or roof. It takes heavy, wide or tall cargo, loaded from the top or sides. End walls may fold down.

A 3.2 m wide transformer on a 40' flat rack goes as over-width (OOG).

Related: Platform OOG Open top MSL Lashing

Open the Load Planner →

Source: Shapiro; IMO, ILO and UNECE; Maersk · checked 27 Oct 2026 · Full page →

FLO-FLO Float on, float offA semi-submersible ship ballasts down until its deck is under water, the cargo floats over it, and the ship rises to…

Project & heavy lift

A semi-submersible ship ballasts down until its deck is under water, the cargo floats over it, and the ship rises to lift it. Used for the very largest pieces such as rigs and modules.

A jack-up rig floated onto a semi-submersible heavy transport ship off Rotterdam.

Related: Semi-submersible LOLO RORO MWS

Source: Skuld · checked 27 Oct 2026 · Full page →

FOB Free on BoardThe seller delivers the goods on board the ship at the named port.

Incoterms

The seller delivers the goods on board the ship at the named port. Risk passes once they are on board. Sea and inland waterway only.

"FOB Hamburg" for breakbulk; for containers FCA usually fits better.

Related: FAS FCA CFR Incoterms

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

Form locking Securing by close stowageStowing cargo tight against the walls of the unit with very small gaps, so the walls take the forces.

Project & heavy lift

Stowing cargo tight against the walls of the unit with very small gaps, so the walls take the forces.

Cartons stacked wall to wall with a dunnage bag in the last gap.

Related: Blocking Lashing

Open the Load Planner →

Source: IMO, ILO and UNECE · checked 27 Oct 2026 · Full page →

Forty-foot 40' container (40GP, 42G1)The standard 40' general-purpose box, about 12.19 m long outside.

Containers

The standard 40' general-purpose box, about 12.19 m long outside. It has twice the floor of a 20' but nowhere near twice the payload.

Light, bulky furniture usually goes in a 40' or 40' high cube.

Related: Twenty-foot High cube FEU

Try Will it fit? →

Source: Shapiro; Port of Tauranga · checked 27 Oct 2026 · Full page →

Free pratique FP: port health clearancePermission from the port health authority for a ship to enter port and deal with the shore.

Chartering

Permission from the port health authority for a ship to enter port and deal with the shore. It confirms the ship meets health rules.

"Free pratique granted by radio on arrival" (radio pratique).

Related: WIFPON NOR

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Free time Days before D&D charges startThe number of days a carrier allows a container at the terminal or with the customer before demurrage or detention…

Containers

The number of days a carrier allows a container at the terminal or with the customer before demurrage or detention is charged. It varies by port, carrier and contract.

"5 days combined free time" covers both port and inland days.

Related: Demurrage (container) Detention

Source: Maersk · checked 27 Oct 2026 · Full page →

Free zone FTZ (foreign-trade zone)A designated area where goods can be stored, processed or re-exported without paying import duty until they enter…

Breakbulk & ports

A designated area where goods can be stored, processed or re-exported without paying import duty until they enter the local market.

Equipment stored in the Jebel Ali Free Zone before shipment on to East Africa.

Related: Bonded warehouse Duty

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

Freight FRT: payment for carriageThe money paid to the carrier for carrying cargo, per tonne, per freight tonne or as a lump sum.

Chartering

The money paid to the carrier for carrying cargo, per tonne, per freight tonne or as a lump sum. On a voyage charter it is the owner's main income.

Freight US$28 per tonne on 40,000 t = US$1,120,000.

Related: Deadfreight Hire

Source: Marine Insight; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Freighter All-cargo aircraftAn aircraft that carries only cargo, with a main deck for large pallets and often a nose or side door for big pieces.

Air freight

An aircraft that carries only cargo, with a main deck for large pallets and often a nose or side door for big pieces.

Out-of-gauge machinery is booked on a freighter, not a passenger flight.

Related: Belly cargo CAO

Try Will it fit? (aircraft and ULDs) →

Source: Lashed & Secured; Röhlig Logistics · checked 27 Oct 2026 · Full page →

Freight forwarder ForwarderA company that arranges transport for shippers: booking carriers, preparing documents, and often customs and insurance.

Air freight

A company that arranges transport for shippers: booking carriers, preparing documents, and often customs and insurance. It may act as agent or as carrier.

The forwarder books air freight, issues a HAWB and clears the goods on arrival.

Related: NVOCC HAWB Customs broker

Source: Port of Brownsville; US Federal Maritime Commission; IATA · checked 27 Oct 2026 · Full page →

Friction Friction factor (μ)How much the surfaces resist sliding.

Project & heavy lift

How much the surfaces resist sliding. Higher friction helps hold cargo, but it never secures it on its own, because ship motion lifts and shakes the load.

Rubber mats under a crate raise friction, but lashings are still needed.

Related: Lashing Dunnage Blocking

Open the Load Planner →

Source: IMO, ILO and UNECE; Netherlands Regulatory Framework · checked 27 Oct 2026 · Full page →

FuelEU FuelEU MaritimeEU rules from 2025 limiting the greenhouse-gas intensity of energy used by ships calling at EU ports.

Surcharges

EU rules from 2025 limiting the greenhouse-gas intensity of energy used by ships calling at EU ports. Carriers may pass the cost on as a surcharge.

A "FuelEU" line appears next to the ETS surcharge on a Europe invoice.

Related: EU ETS surcharge

Read the bunker surcharge guide →

Source: EUR-Lex; Lashed & Secured · checked 27 Oct 2026 · Full page →

FWB Air waybill data messageThe electronic message carrying the air waybill details from forwarder to airline.

Air freight

The electronic message carrying the air waybill details from forwarder to airline. XFWB is the XML version.

The airline will not accept the freight until the FWB is received.

Related: e-AWB FHL

Source: IATA · checked 27 Oct 2026 · Full page →

G

Gang Stevedore gangA team of dockers working one hatch or crane.

Breakbulk & ports

A team of dockers working one hatch or crane. Rates and laytime are sometimes set per gang.

Two gangs working hold 3 overnight.

Related: Stevedore PHPD

Source: MOL Logistics; BIMCO · checked 27 Oct 2026 · Full page →

Gantry crane Ship-to-shore or quay gantry craneA large crane on rails along the quay.

Breakbulk & ports

A large crane on rails along the quay. Container gantries lift boxes on and off ships; some heavy gantries handle breakbulk and heavy lifts.

A container gantry with a 65 t limit under the spreader.

Related: LOLO

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

Gate in / gate out Container entering or leaving a terminalGate in is when a container enters a port, depot or inland terminal and is checked and recorded.

Containers

Gate in is when a container enters a port, depot or inland terminal and is checked and recorded. Gate out is when it leaves after release. Both are standard tracking events, and they often start or stop the D&D clock.

Full import gated out on 14 Nov, empty gated in at the depot on 20 Nov: 6 days with the customer.

Related: EIR Demurrage (container) Detention

Source: DP World glossary; Vizion; Maersk · checked 27 Oct 2026 · Full page →

General cargo Mixed packaged cargoCargo in units or packages, containerised or breakbulk, as opposed to bulk.

Breakbulk & ports

Cargo in units or packages, containerised or breakbulk, as opposed to bulk. Port statistics often group it this way.

A port handles 2 million t of general cargo and 8 million t of bulk.

Related: Breakbulk Bulk cargo

Source: Port of Brownsville; Port of Tauranga · checked 27 Oct 2026 · Full page →

GMR Goods movement referenceThe single reference from GVMS that a haulier needs to move goods through those ports.

Customs & documents

The single reference from GVMS that a haulier needs to move goods through those ports. Without a valid GMR the vehicle cannot board.

The driver shows the GMR at check-in.

Related: GVMS

Source: GOV.UK · checked 27 Oct 2026 · Full page →

GRT Gross registered tonnageAn older measure of a ship's enclosed internal volume, not its weight.

Chartering

An older measure of a ship's enclosed internal volume, not its weight. Port dues are often based on gross tonnage.

A port charges dues per GT, so a large ro-ro pays more than a small tanker.

Related: DWT

Source: Port of Tauranga; The Baltic Exchange · checked 27 Oct 2026 · Full page →

GT Gross tonnageA measure of a ship's overall size, worked out from the volume of all its enclosed spaces under the 1969 Tonnage…

Chartering

A measure of a ship's overall size, worked out from the volume of all its enclosed spaces under the 1969 Tonnage Convention. It has no unit and is not a weight. Many rules and port charges use it as a threshold.

The ISPS Code applies to cargo ships of 500 GT and above on international voyages; the UK ETS covers ships of 5,000 GT and above.

Related: GRT DWT ISPS Code

Source: Wärtsilä Encyclopedia of Ship Technology; GOV.UK · checked 27 Oct 2026 · Full page →

GVMS Goods Vehicle Movement ServiceHMRC's system for moving goods through ports without space for customs checks.

Customs & documents

HMRC's system for moving goods through ports without space for customs checks. It links all a vehicle's declarations into one goods movement reference (GMR).

Before the Dover crossing, the haulier creates a GMR in GVMS.

Related: GMR CDS

Source: GOV.UK · checked 27 Oct 2026 · Full page →

H

Hatch Hatch and hatch coverThe opening in the deck through which cargo goes into the hold, closed by a hatch cover.

Breakbulk & ports

The opening in the deck through which cargo goes into the hold, closed by a hatch cover. Hatch size limits the largest piece that can go below.

A 14 m long piece will not go below if the hatch opening is 12.8 m.

Related: Hold Tween deck PHPD

Try Will it fit? →

Source: MOL Logistics; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Haulier Road haulage companyThe company that carries goods by road, the carrier under a CMR contract.

Road

The company that carries goods by road, the carrier under a CMR contract.

The haulier collects the flat rack from the port on a skeletal trailer.

Related: CMR O licence Heavy hauler

Source: nibusinessinfo.co.uk · checked 27 Oct 2026 · Full page →

HAWB House air waybillThe forwarder's own air waybill to each shipper in a consolidation.

Air freight

The forwarder's own air waybill to each shipper in a consolidation. The airline only sees the master air waybill.

Your HAWB number tracks your 3 cartons within the forwarder's consolidation.

Related: MAWB Consolidation House B/L

Source: IATA · checked 27 Oct 2026 · Full page →

HEAVYCON BIMCO heavy transport charter (2007)A BIMCO voyage charter for heavy transport, often on semi-submersibles, with "knock-for-knock" sharing of liability.

Project & heavy lift

A BIMCO voyage charter for heavy transport, often on semi-submersibles, with "knock-for-knock" sharing of liability.

A rig move fixed on HEAVYCON 2007 terms.

Related: Semi-submersible BIMCO

Source: Skuld; BIMCO · checked 27 Oct 2026 · Full page →

Heavy hauler Heavy haulage contractorA road haulier with the tractors, trailers and permits to move abnormal loads.

Project & heavy lift

A road haulier with the tractors, trailers and permits to move abnormal loads.

The heavy hauler books the police escort and the route survey.

Related: AIL STGO

Source: Port of Brownsville; National Highways · checked 27 Oct 2026 · Full page →

High cube HC or HQ (40HC, 45G1)A container 9'6" (about 2.90 m) high outside instead of 8'6".

Containers

A container 9'6" (about 2.90 m) high outside instead of 8'6". It gives about 30 cm more inside height for light, bulky or slightly tall cargo.

A 2.45 m tall crate fits through a 40' HC door (about 2.59 m high) but not a standard 40' door (about 2.28 m).

Related: Forty-foot Open top OOG

Try Will it fit? →

Source: Shapiro; Maersk · checked 27 Oct 2026 · Full page →

Hire Time charter paymentThe money a time charterer pays the owner for use of the ship, usually per day and in advance.

Chartering

The money a time charterer pays the owner for use of the ship, usually per day and in advance.

"Hire US$13,750 per day, payable 15 days in advance".

Related: Time charter PDPR

Source: Marine Insight; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Hold Cargo holdThe cargo space inside the ship below deck, under a hatch.

Breakbulk & ports

The cargo space inside the ship below deck, under a hatch.

Hold 2 is box-shaped, so long pieces stow without gaps.

Related: Hatch Tween deck Tank top

Source: MOL Logistics; The Baltic Exchange · checked 27 Oct 2026 · Full page →

House B/L HBL: house bill of ladingA bill of lading issued by an NVOCC or forwarder to its own customer.

Customs & documents

A bill of lading issued by an NVOCC or forwarder to its own customer. The shipping line issues a master B/L to the NVOCC.

Your HBL names you as shipper; the line's MBL names the forwarder.

Related: NVOCC HAWB

Source: US Federal Maritime Commission · checked 27 Oct 2026 · Full page →

Hub port Transhipment hubA large port where big ships drop and collect containers that feeders then carry on to smaller ports.

Containers

A large port where big ships drop and collect containers that feeders then carry on to smaller ports.

Boxes for a small port are dropped at the hub and taken on by feeder.

Related: Feeder Transhipment

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

I

IATA International Air Transport AssociationThe airlines' trade association.

Air freight

The airlines' trade association. It publishes the Dangerous Goods Regulations and standards for air waybills and ULDs.

Forwarders work to the current IATA DGR edition.

Related: DGR ULD

Source: IATA; DSV · checked 27 Oct 2026 · Full page →

ICAO TI ICAO Technical InstructionsThe legal rules for carrying dangerous goods by air, issued by the UN's aviation body.

Air freight

The legal rules for carrying dangerous goods by air, issued by the UN's aviation body. The IATA DGR is based on them.

A state variation adds extra rules to the ICAO TI for that country.

Related: DGR

Read the DG by air guide →

Source: ICAO; Lashed & Secured · checked 27 Oct 2026 · Full page →

ICS2 Import Control System 2The EU's safety and security system for entry summary declarations.

Customs & documents

The EU's safety and security system for entry summary declarations. In the UK it is used for goods entering Northern Ireland.

Goods from GB to Northern Ireland need an ENS in ICS2.

Related: ENS S&S GB

Source: GOV.UK · checked 27 Oct 2026 · Full page →

IMDG Code International Maritime Dangerous Goods CodeThe IMO rules for carrying dangerous goods by sea, mandatory under SOLAS.

Dangerous goods

The IMO rules for carrying dangerous goods by sea, mandatory under SOLAS. It is amended every two years.

Amendment 42-24 has been mandatory since 1 January 2026.

Related: DG DGD Segregation EmS SOLAS

Read the DG by sea guide →

Source: IMO; Exis Technologies; Lashed & Secured · checked 27 Oct 2026 · Full page →

IMO International Maritime OrganizationThe United Nations agency that sets worldwide rules for ship safety, security and pollution.

Chartering

The United Nations agency that sets worldwide rules for ship safety, security and pollution. SOLAS, the IMDG Code, the CSS Code and the ISPS Code all come from the IMO.

The VGM rule for packed containers is an IMO amendment to SOLAS, in force since 1 July 2016.

Related: SOLAS IMDG Code CSS Code ISPS Code

Source: IMO; GOV.UK · checked 27 Oct 2026 · Full page →

Import VAT VAT due on imported goodsVAT charged when goods are imported.

Customs & documents

VAT charged when goods are imported. In the UK it is worked out on the customs value plus duty and the costs of getting the goods to their first UK destination. VAT-registered importers can use PVA instead of paying at the border.

Customs value £10,000 + duty £200 + £300 freight to the first UK destination = £10,500; import VAT at 20% = £2,100.

Related: PVA Duty

Source: GOV.UK · checked 27 Oct 2026 · Full page →

Incoterms Incoterms® 2020 rules (ICC)Eleven three-letter trade terms from the International Chamber of Commerce.

Incoterms

Eleven three-letter trade terms from the International Chamber of Commerce. In a sales contract they say who arranges and pays for each stage, who clears customs, and where risk passes. Always add a precise place and the edition.

"FCA Unit 4, Trafford Park, Manchester, Incoterms 2020".

Related: EXW FCA FOB CIF DAP DDP

Read the Incoterms guide →

Source: International Chamber of Commerce; Lashed & Secured · checked 27 Oct 2026 · Full page →

Intermodal transport One loading unit, several modesGoods stay in one loading unit, such as a container or swap body, while it moves by two or more modes.

Containers

Goods stay in one loading unit, such as a container or swap body, while it moves by two or more modes. The goods themselves are not handled when the mode changes.

A 40' goes by rail from Felixstowe to Birmingham, then by truck to the consignee, without being opened.

Related: Multimodal transport Swap body CTU

Source: European Union Agency for Railways (ERA) terminology collection; DP World glossary · checked 27 Oct 2026 · Full page →

ISPM 15 Rules for wood packaging in tradeThe international standard for wooden pallets, crates and dunnage: the wood must be debarked, treated (for example…

Customs & documents

The international standard for wooden pallets, crates and dunnage: the wood must be debarked, treated (for example heated to 56°C for at least 30 minutes) and marked. Plywood and other processed wood are exempt.

The timber skid and crate for an export machine carry the ISPM 15 mark with the country code and treatment.

Related: Dunnage

Source: GOV.UK · checked 27 Oct 2026 · Full page →

ISPS Code International Ship and Port Facility Security CodeSecurity rules under SOLAS chapter XI-2 for ships on international voyages and the port facilities that serve them.

Breakbulk & ports

Security rules under SOLAS chapter XI-2 for ships on international voyages and the port facilities that serve them. Ships need an approved security plan and a trained security officer, and security levels go up when the threat changes.

It applies to cargo ships of 500 GT and above on international voyages, so a project cargo ship needs an approved ship security plan.

Related: SOLAS IMO GT

Source: GOV.UK · checked 27 Oct 2026 · Full page →

K

Known consignor KC (UK aviation security)A shipper approved by the UK CAA whose own security procedures mean its air cargo does not need screening later.

Air freight

A shipper approved by the UK CAA whose own security procedures mean its air cargo does not need screening later. Approval is checked each year.

A known consignor's sealed pallets go straight onto the aircraft without x-ray.

Related: Regulated agent

Source: UK Civil Aviation Authority · checked 27 Oct 2026 · Full page →

L

Lashing Tying cargo downSecuring cargo with chains, wire, webbing or rods to strong points, so it cannot slide or tip.

Project & heavy lift

Securing cargo with chains, wire, webbing or rods to strong points, so it cannot slide or tip. Each lashing is only as strong as its weakest part.

Four chain lashings hold a 12 t machine on a flat rack, each tensioned with a lever binder.

Related: MSL Blocking Friction Lashing ring

Open the Load Planner →

Source: IMO, ILO and UNECE; Netherlands Regulatory Framework · checked 27 Oct 2026 · Full page →

Lashing ring Lashing point in a containerSteel rings or bars fixed inside a container for tying cargo down.

Containers

Steel rings or bars fixed inside a container for tying cargo down. They have a rated strength, which is often low, so always check it before planning.

The CTU Code expects floor lashing points in a container to be rated at least 10 kN.

Related: MSL Lashing CTU Code

Open the Load Planner →

Source: IMO, ILO and UNECE · checked 27 Oct 2026 · Full page →

Laycan Laydays and cancelling (dates)The window of dates in which the ship must arrive at the loading port, ready to load.

Chartering

The window of dates in which the ship must arrive at the loading port, ready to load. If it is late, the charterer may cancel the charter.

"Laycan 10–15 May" means the ship must be ready to load between 10 and 15 May.

Related: NOR Laytime Demurrage

Source: The Baltic Exchange; MOL Logistics · checked 27 Oct 2026 · Full page →

Laytime Time allowed to load or dischargeThe time the owner gives the charterer to load or discharge, with no extra payment beyond freight.

Chartering

The time the owner gives the charterer to load or discharge, with no extra payment beyond freight. If it runs out, demurrage starts. If cargo work finishes early, despatch may be due.

"Laytime 3 WWD SHEX" means three weather working days, Sundays and holidays excluded.

Related: Laycan Demurrage Despatch NOR

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

LC Lashing capacity (EN 12195-2)The most force a lashing may take in use, in daN or kN, marked on its label.

Project & heavy lift

The most force a lashing may take in use, in daN or kN, marked on its label. It is a share of the breaking strength; where a label shows two LC values, use the lower. LC is for securing only, never a lifting rating.

A label reading "LC 2,500 daN" means that strap may take up to 2,500 daN in a direct lashing. It says nothing about lifting.

Related: STF MSL Direct lashing WLL

Open the Load Planner →

Source: European Commission, DG MOVE; Dolezych · checked 27 Oct 2026 · Full page →

LCL Less than container loadYour cargo shares a container with other shippers' goods.

Containers

Your cargo shares a container with other shippers' goods. You pay by volume or weight, and the box is packed and unpacked at a freight station.

Three pallets (3.6 m³) shipped LCL, charged per cubic metre.

Related: FCL CFS Consolidation

Open the Pallet Builder →

Source: Maersk; Port of Brownsville · checked 27 Oct 2026 · Full page →

LD3 AKE / AVE lower-deck containerThe most common lower-deck container on wide-body aircraft.

Air freight

The most common lower-deck container on wide-body aircraft. Its base is about 1.5 × 1.5 m and it is about 1.6 m high, with a sloped side to fit the hull.

Suitcases and small cargo travel in LD3s under the passenger deck.

Related: ULD

Try Will it fit? (aircraft and ULDs) →

Source: Röhlig Logistics; DSV · checked 27 Oct 2026 · Full page →

LDM Loading metreOne metre of trailer floor length across the full width (about 2.4 m), so about 2.4 m² of floor.

Road

One metre of trailer floor length across the full width (about 2.4 m), so about 2.4 m² of floor. Road groupage is often charged per loading metre.

Cargo covering 4.8 m² of floor uses about 2 LDM.

Open the Pallet Builder →

Source: TIMOCOM · checked 27 Oct 2026 · Full page →

Lifting points Lifting lugs or trunnionsRated points on a piece designed for slinging.

Project & heavy lift

Rated points on a piece designed for slinging. They should sit evenly around the CoG and be clearly marked.

Four lifting lugs rated 25 t each on a 60 t skid.

Related: CoG SWL

Open the Load Planner →

Source: Skuld · checked 27 Oct 2026 · Full page →

Limited quantity LQDangerous goods in small inner packagings that benefit from lighter rules.

Dangerous goods

Dangerous goods in small inner packagings that benefit from lighter rules. Packages carry a black-and-white diamond LQ mark instead of hazard labels, but are still declared.

Aerosols packed 12 to a carton shipped as LQ.

Related: Excepted quantity DGD

Read the DG by sea guide →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

Liner service Scheduled shipping serviceShips that sail a fixed route on a published schedule, calling at the same ports in turn.

Containers

Ships that sail a fixed route on a published schedule, calling at the same ports in turn. Container lines work this way: shippers book space rather than hire the ship.

A weekly Asia to North Europe loop calling Shanghai, Ningbo, Singapore, Rotterdam, Felixstowe and Hamburg.

Related: Tramp shipping Feeder Blank sailing

Read the shipping guides →

Source: Marine Insight · checked 27 Oct 2026 · Full page →

Lithium batteries UN 3480, 3481, 3090, 3091Class 9 dangerous goods.

Dangerous goods

Class 9 dangerous goods. By air, lithium-ion batteries on their own (UN 3480) are cargo aircraft only and limited to 30% state of charge. Every type must have passed UN 38.3 tests.

A pallet of spare power-tool batteries is UN 3480, so it flies on a freighter.

Related: CAO DGR DG class

Read the DG by air guide →

Source: Lashed & Secured; IATA · checked 27 Oct 2026 · Full page →

LOA Length overallThe total length of the ship from the tip of the bow to the stern.

Chartering

The total length of the ship from the tip of the bow to the stern. Ports and locks set LOA limits.

A berth limited to 200 m LOA.

Related: Draft

Source: Port of Tauranga; Port of Brownsville; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Load spreading Spreading weight with beams or dunnagePutting timber or steel beams, or grillage, under a heavy piece so its weight reaches the floor, deck or flat rack…

Project & heavy lift

Putting timber or steel beams, or grillage, under a heavy piece so its weight reaches the floor, deck or flat rack beams over a longer length or a larger area.

Hapag-Lloyd lets bedding beams extend the resting length by no more than 1 m beyond each end of the load.

Related: Point load Dunnage

Open the Load Planner →

Source: Hapag-Lloyd; Skuld · checked 27 Oct 2026 · Full page →

LOI Letter of indemnityA promise to compensate the carrier if it acts on instructions that put it at risk, such as delivering without an…

Customs & documents

A promise to compensate the carrier if it acts on instructions that put it at risk, such as delivering without an original B/L. It is only as good as the party giving it.

Cargo released at discharge against an LOI because the originals are still with the bank.

Related: B/L Switch B/L

Source: West of England P&I Club · checked 27 Oct 2026 · Full page →

LOLO Lift on, lift offCargo is lifted on and off the ship by cranes, either the ship's own or the port's.

Project & heavy lift

Cargo is lifted on and off the ship by cranes, either the ship's own or the port's.

A 120 t transformer goes LOLO with the ship's cranes at a berth with no heavy shore crane.

Related: RORO FLO-FLO

Source: Port of Tauranga; Port of Brownsville; Skuld · checked 27 Oct 2026 · Full page →

LSS Low sulphur surchargeA surcharge for the extra cost of low-sulphur fuel.

Surcharges

A surcharge for the extra cost of low-sulphur fuel. IMO rules limit sulphur to 0.50% worldwide from 2020, and 0.10% in emission control areas. Many carriers now fold it into BAF.

An ECA surcharge on a sailing through the North Sea.

Related: BAF ECA VLSFO

Read the bunker surcharge guide →

Source: IMO; Lashed & Secured · checked 27 Oct 2026 · Full page →

LTL Less than truck load (part load)A shipment too small to fill a truck, usually combined with others on the same vehicle.

Road

A shipment too small to fill a truck, usually combined with others on the same vehicle.

4 pallets sent LTL, priced per pallet or loading metre.

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

M

Manifest Cargo manifestThe list of all the cargo on a ship (or aircraft or truck), by bill of lading, for customs and the port.

Breakbulk & ports

The list of all the cargo on a ship (or aircraft or truck), by bill of lading, for customs and the port.

The agent files the manifest before arrival.

Related: B/L ENS Tally

Source: Port of Tauranga; Port of Brownsville · checked 27 Oct 2026 · Full page →

Marine pollutant MPA substance harmful to the sea.

Dangerous goods

A substance harmful to the sea. Packages and containers need the marine pollutant mark (a dead fish and tree) as well as any hazard labels.

Some paints and pesticides are marine pollutants.

Related: IMDG Code Placard

Read the DG by sea guide →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

MAWB Master air waybillThe airline's air waybill for a consolidated shipment, issued to the forwarder.

Air freight

The airline's air waybill for a consolidated shipment, issued to the forwarder. It covers all the house shipments inside.

One MAWB covers 12 HAWBs on the same flight to Dubai.

Related: HAWB Consolidation FHL

Source: IATA · checked 27 Oct 2026 · Full page →

Max gross Maximum gross mass (MGW)The most a container and its cargo may weigh together.

Containers

The most a container and its cargo may weigh together. It is on the CSC safety plate.

Max gross 32,500 kg minus tare 2,200 kg leaves 30,300 kg payload.

Related: Tare Payload CSC plate

Open the VGM calculator →

Source: IMO, ILO and UNECE; Shapiro · checked 27 Oct 2026 · Full page →

MFAG Medical First Aid GuideA guide in the IMDG Code supplement for treating people exposed to dangerous goods at sea.

Dangerous goods

A guide in the IMDG Code supplement for treating people exposed to dangerous goods at sea.

The master checks MFAG after a crew member is splashed with a corrosive.

Related: EmS IMDG Code

Read the DG by sea guide →

Source: Exis Technologies · checked 27 Oct 2026 · Full page →

MSL Maximum securing loadThe load a lashing or securing item is allowed to take when securing cargo on a ship.

Project & heavy lift

The load a lashing or securing item is allowed to take when securing cargo on a ship. Under the CSS Code it is a set share of the breaking strength, for example 50% for chains and web lashings.

A web lashing with a 50 kN breaking strength has an MSL of 25 kN under the CSS Code table.

Related: CS Lashing SWL Breaking load CSS Code

Open the Load Planner →

Source: Netherlands Regulatory Framework; IMO, ILO and UNECE · checked 27 Oct 2026 · Full page →

Multimodal transport Two or more modes, often under one contractCarriage by at least two modes, such as road and sea.

Containers

Carriage by at least two modes, such as road and sea. In the legal sense, one operator takes responsibility for the whole journey under a single multimodal contract.

A forwarder issues one combined transport B/L from a factory in Leeds to a site in Dammam: truck, ship, then truck.

Related: Intermodal transport Freight forwarder B/L POR

Source: European Union Agency for Railways (ERA) terminology collection; United Nations Treaty Collection · checked 27 Oct 2026 · Full page →

MWS Marine warranty surveyorAn independent surveyor appointed for the insurers to review and approve non-routine marine operations, such as…

Project & heavy lift

An independent surveyor appointed for the insurers to review and approve non-routine marine operations, such as heavy transport or a tow. If satisfied, the MWS issues a certificate of approval.

The MWS must approve the seafastening before the semi-sub can sail.

Related: Certificate of approval FLO-FLO

Source: Skuld · checked 27 Oct 2026 · Full page →

N

NCTS New Computerised Transit SystemThe electronic system for transit declarations, which let goods move under customs control without paying duty until…

Customs & documents

The electronic system for transit declarations, which let goods move under customs control without paying duty until they reach their destination office.

A trailer from Turkey crosses the EU to the UK under an NCTS transit declaration.

Related: Transit

Source: GOV.UK · checked 27 Oct 2026 · Full page →

Neo-bulk Neo-bulk cargoUniform units such as cars, steel coils, pipes or timber packs, stowed in large numbers almost like bulk but handled…

Breakbulk & ports

Uniform units such as cars, steel coils, pipes or timber packs, stowed in large numbers almost like bulk but handled as separate pieces.

A ship of 3,000 identical steel coils is a neo-bulk cargo.

Related: Breakbulk Bulk cargo

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

Non-reversible Separate laytime at each endLoading and discharge laytime are counted separately and cannot be combined.

Chartering

Loading and discharge laytime are counted separately and cannot be combined.

"3 days to load, 3 days to discharge, non-reversible".

Related: Reversible Average laytime

Source: The Baltic Exchange · checked 27 Oct 2026 · Full page →

NOR Notice of readinessThe master's notice to the charterer or receiver that the ship has arrived and is ready to load or discharge.

Chartering

The master's notice to the charterer or receiver that the ship has arrived and is ready to load or discharge. Laytime usually starts a set time after a valid NOR.

"NOR tendered 06:00, laytime to start 12 hours after" in the statement of facts.

Related: Laytime WIFPON Turn time

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

N.O.S. Not otherwise specifiedA general entry used when a substance has no specific name in the list.

Dangerous goods

A general entry used when a substance has no specific name in the list. It usually needs the technical name added in brackets.

UN 1993 FLAMMABLE LIQUID, N.O.S. (xylene, ethanol).

Related: PSN UN number

Read the DG by sea guide →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

Notify party Party told when cargo arrivesThe person or company named on a B/L or waybill to be told when the shipment arrives.

Customs & documents

The person or company named on a B/L or waybill to be told when the shipment arrives. It is often the buyer or its customs broker, and can be different from the consignee.

The buyer's customs broker is notify party, so it gets the arrival notice and starts clearance.

Related: Consignee Shipper B/L Customs broker

Source: DP World glossary; ZIM · checked 27 Oct 2026 · Full page →

NVOCC Non-vessel operating common carrierA carrier that sells ocean transport and issues its own house bill of lading, but does not run ships.

Containers

A carrier that sells ocean transport and issues its own house bill of lading, but does not run ships. To the shipping line, it is the shipper.

An NVOCC books 20 boxes a week with a line and resells the space to small shippers.

Related: House B/L Consolidation Freight forwarder

Source: US Federal Maritime Commission; Port of Brownsville · checked 27 Oct 2026 · Full page →

O

OBL Original bill of ladingA signed original B/L, usually issued as a set of three.

Customs & documents

A signed original B/L, usually issued as a set of three. One original normally has to be handed in at destination to take delivery, unless it was surrendered at origin for a telex release.

"3/3 originals" on the B/L: the full set goes to the buyer's bank under the letter of credit.

Related: B/L

Source: DP World glossary; ZIM · checked 27 Oct 2026 · Full page →

O licence Goods vehicle operator licenceThe licence a UK business needs to use goods vehicles over 3.5 t for its business.

Road

The licence a UK business needs to use goods vehicles over 3.5 t for its business. Standard international licences cover hire and reward abroad.

A haulier's O licence lists how many vehicles and trailers it may run.

Related: Haulier

Source: GOV.UK · checked 27 Oct 2026 · Full page →

Once on demurrage Always on demurrageOnce laytime has run out, demurrage runs without stopping, even through weekends, holidays or bad weather, unless…

Chartering

Once laytime has run out, demurrage runs without stopping, even through weekends, holidays or bad weather, unless the charter says otherwise.

A ship on demurrage on Friday is still on demurrage over the weekend under SHEX terms.

Related: Demurrage Laytime SHEX

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

On deck / under deck Stowage positionUnder deck is the covered hold space, for sensitive cargo.

Project & heavy lift

Under deck is the covered hold space, for sensitive cargo. On deck is the open space above the hatches, used for oversized or weather-proof cargo; it is more exposed.

Wind turbine towers carried on deck, gearboxes under deck.

Related: Tween deck Stowage plan

Source: MOL Logistics; Skuld · checked 27 Oct 2026 · Full page →

OOG Out of gaugeCargo that sticks out beyond the normal size of the container, over its length, width or height.

Containers

Cargo that sticks out beyond the normal size of the container, over its length, width or height. It needs special stowage and costs more, because it takes space from boxes around it.

A 2.9 m high excavator on a 40' flat rack is over-height (OOG) by about 0.94 m, above the rack's in-gauge height of about 1.96 m.

Related: Flat rack Open top Over-height Over-width Breakbulk

Try Will it fit? →

Source: Maersk · checked 27 Oct 2026 · Full page →

Open top OT containerA container with a removable tarpaulin roof, so tall cargo can be lifted in from above by crane.

Containers

A container with a removable tarpaulin roof, so tall cargo can be lifted in from above by crane. Cargo taller than the walls is out of gauge.

A 2.3 m tall machine, too tall for a standard door, craned into a 40' open top with the tarpaulin refitted over it.

Related: Flat rack OOG High cube

Try Will it fit? →

Source: Shapiro; Maersk · checked 27 Oct 2026 · Full page →

Over-height OHCargo higher than the top of the container frame.

Containers

Cargo higher than the top of the container frame. Nothing can be stacked directly on top, and the carrier charges for the lost slots.

Over-height by 40 cm on an open top.

Related: OOG Over-width

Try Will it fit? →

Source: Maersk · checked 27 Oct 2026 · Full page →

Over-width OWCargo wider than the container, sticking out past the side.

Containers

Cargo wider than the container, sticking out past the side. It blocks the slots next to it on the ship.

Over-width 30 cm each side on a flat rack.

Related: OOG Over-height

Try Will it fit? →

Source: Maersk · checked 27 Oct 2026 · Full page →

P

Packing certificate Container or vehicle packing certificateSigned by whoever packed a container with dangerous goods.

Dangerous goods

Signed by whoever packed a container with dangerous goods. It confirms the unit was fit, the goods were segregated and secured, and it is correctly marked and placarded.

Section 5.4.2 of the IMDG Code sets out what it must say.

Related: DGD DGN Segregation

Read the DG by sea guide →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

Packing group PG I, II or IIIThe degree of danger within a class: PG I high, PG II medium, PG III low.

Dangerous goods

The degree of danger within a class: PG I high, PG II medium, PG III low. It decides how strong the packaging must be and the quantity limits.

Most paints are PG II or III.

Related: UN number UN packaging

Read the DG by sea guide →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

PAG P1P / PAG palletAn 88 × 125 inch (about 3.2 × 2.2 m) aircraft pallet.

Air freight

An 88 × 125 inch (about 3.2 × 2.2 m) aircraft pallet. Slightly narrower than a PMC.

A PAG pallet built up to 1.6 m for the lower deck.

Related: ULD PMC

Try Will it fit? (aircraft and ULDs) →

Source: Röhlig Logistics; DSV · checked 27 Oct 2026 · Full page →

Payload Maximum payloadThe most cargo weight the container can carry.

Containers

The most cargo weight the container can carry. Road and rail limits on the way may be lower, so check them too.

A 20' rated for 28,000 kg payload may still be limited to less on European roads.

Related: Tare Max gross VGM

Try Will it fit? →

Source: Shapiro · checked 27 Oct 2026 · Full page →

PDPR Per day pro rataA daily rate charged in proportion for part days, such as demurrage or hire.

Chartering

A daily rate charged in proportion for part days, such as demurrage or hire.

Demurrage US$20,000 PDPR: 6 hours costs US$5,000.

Related: Demurrage Hire

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

PHPD Per hatch per dayA laytime rate set per hatch per day.

Chartering

A laytime rate set per hatch per day. Laytime is the cargo quantity divided by the daily rate times the number of hatches.

30,000 t at 1,000 t PHPD with 5 hatches gives 6 days' laytime.

Related: PWHPD Laytime

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Pilot Marine pilotA licensed local navigator who boards to guide the ship in and out of port.

Breakbulk & ports

A licensed local navigator who boards to guide the ship in and out of port.

The pilot boards 2 hours before berthing.

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

Placard Large hazard labelA large class label (at least 250 × 250 mm) on the outside of a container or vehicle carrying dangerous goods, on…

Dangerous goods

A large class label (at least 250 × 250 mm) on the outside of a container or vehicle carrying dangerous goods, on all four sides.

A container with class 3 paint is placarded on both sides and both ends.

Related: DG class Marine pollutant

Read the DG by sea guide →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

Place of delivery Where the carrier hands over the cargoWhere the carrier hands the cargo to the consignee.

Breakbulk & ports

Where the carrier hands the cargo to the consignee. It may be inland, after the port of discharge. The carrier's responsibility ends there.

POD Hamburg, place of delivery a rail terminal in Munich.

Related: POD POR Proof of delivery

Source: Digital Container Shipping Association; ZIM · checked 27 Oct 2026 · Full page →

Platform PL: container platformA flat container base with no end walls, sides or roof.

Containers

A flat container base with no end walls, sides or roof. Several can be laid side by side to carry very large pieces as breakbulk on a ship.

Two 40' platforms side by side under a 60 t boiler stowed in the hold.

Related: Flat rack Breakbulk OOG

Open the Load Planner →

Source: IMO, ILO and UNECE; Shapiro · checked 27 Oct 2026 · Full page →

PMC P6P / PMC palletA 96 × 125 inch (about 3.2 × 2.4 m) aircraft pallet, one of the most widely used.

Air freight

A 96 × 125 inch (about 3.2 × 2.4 m) aircraft pallet, one of the most widely used. Cargo is built up on it and held down with a net.

A machine 2.2 m wide fits on a PMC, if the height suits the deck.

Related: ULD PAG

Try Will it fit? (aircraft and ULDs) →

Source: Röhlig Logistics; DSV · checked 27 Oct 2026 · Full page →

POD Port of dischargeThe port where the cargo is unloaded from the last sea-going ship.

Breakbulk & ports

The port where the cargo is unloaded from the last sea-going ship. POD can also mean proof of delivery, so check which is meant.

POD Jebel Ali, place of delivery an inland depot in Dubai.

Related: POL Place of delivery Proof of delivery

Read the shipping guides →

Source: Digital Container Shipping Association; ZIM · checked 27 Oct 2026 · Full page →

Point load Concentrated loadWeight resting on a small area, such as feet, runners or short skids, instead of being spread out.

Project & heavy lift

Weight resting on a small area, such as feet, runners or short skids, instead of being spread out. A piece can be well within a container's payload and still overload the floor or deck under its feet.

A 12 t press on runners 3 m long puts 12 / 3 = 4 t on each metre of floor: check that against the unit's limit for that length.

Related: Load spreading Payload Flat rack

Try Will it fit? →

Source: UK P&I Club; Hapag-Lloyd; European Commission, DG MOVE · checked 27 Oct 2026 · Full page →

POL Port of loadingThe port where the cargo is loaded on the first sea-going ship.

Breakbulk & ports

The port where the cargo is loaded on the first sea-going ship. It is shown on the B/L, and the carrier's cut-offs are set for it.

POL Felixstowe, POD Jebel Ali.

Related: POD POR Place of delivery

Read the shipping guides →

Source: Digital Container Shipping Association; ZIM; DP World glossary · checked 27 Oct 2026 · Full page →

POR Place of receiptWhere the carrier takes over the cargo from the shipper when that is before the port of loading, for example an…

Breakbulk & ports

Where the carrier takes over the cargo from the shipper when that is before the port of loading, for example an inland terminal. The carrier's responsibility starts there.

POR Manchester inland terminal, POL Liverpool: the line arranges the first leg.

Related: POL Place of delivery Multimodal transport

Source: Digital Container Shipping Association; ZIM · checked 27 Oct 2026 · Full page →

Prepaid / collect Who pays the freight, and whereFreight prepaid is paid by the shipper at origin, before the B/L is released.

Surcharges

Freight prepaid is paid by the shipper at origin, before the B/L is released. Freight collect is paid by the consignee at destination, before the cargo is released.

"Freight collect" on an FOB sale: the buyer pays the line at destination.

Related: Freight B/L FOB

Read the Incoterms guide →

Source: DP World glossary; ZIM · checked 27 Oct 2026 · Full page →

Pre-tension Initial tension in a lashingThe tension put into a lashing when it is tightened, before the journey loads it.

Project & heavy lift

The tension put into a lashing when it is tightened, before the journey loads it. EU guidance says no more than half the LC. Tension can drop on soft cargo, so lashings are checked and re-tightened.

On a soft, wrapped load, strap tension can fall to half or less, so the driver checks and re-tightens.

Related: STF LC Tie-down lashing

Open the Load Planner →

Source: European Commission, DG MOVE · checked 27 Oct 2026 · Full page →

Project cargo Cargo for a construction or industrial projectLarge, heavy, high-value or critical equipment moved for a project, such as a plant, refinery or wind farm.

Project & heavy lift

Large, heavy, high-value or critical equipment moved for a project, such as a plant, refinery or wind farm. It usually needs engineered handling, special ships and careful planning.

Moving 40 modules, 3 transformers and 2,000 t of steel for a power station is a project cargo job.

Related: Breakbulk OOG

Open the Load Planner →

Source: Skuld; Port of Brownsville · checked 27 Oct 2026 · Full page →

Proof of delivery POD: signed delivery recordA document signed by the receiver to confirm the goods arrived, with the date, the time and any visible damage noted.

Customs & documents

A document signed by the receiver to confirm the goods arrived, with the date, the time and any visible damage noted.

The driver's proof of delivery notes "1 crate corner damaged", which backs up the claim.

Related: CMR Claused B/L POD

Source: DP World glossary · checked 27 Oct 2026 · Full page →

PSN Proper shipping nameThe exact official name that goes with a UN number on documents and packages.

Dangerous goods

The exact official name that goes with a UN number on documents and packages. Trade names are not enough on their own.

UN 1223 KEROSENE: "KEROSENE" is the proper shipping name.

Related: UN number N.O.S.

Read the DG by sea guide →

Source: Exis Technologies; Lashed & Secured · checked 27 Oct 2026 · Full page →

PSS Peak season surchargeAn extra charge carriers add on a trade when demand is high, for example before holiday seasons.

Surcharges

An extra charge carriers add on a trade when demand is high, for example before holiday seasons.

Hapag-Lloyd applied a PSS on South France to Middle East cargo from 18 November 2019.

Related: BAF

Source: Hapag-Lloyd · checked 27 Oct 2026 · Full page →

PTI Pre-trip inspectionA check of an empty reefer before it is released to the shipper: the cooling unit, temperature control and recorder,…

Containers

A check of an empty reefer before it is released to the shipper: the cooling unit, temperature control and recorder, the structure and how clean it is inside.

The terminal asks for PTI orders 48 hours before the reefer is collected.

Related: Reefer

Source: APM Terminals · checked 27 Oct 2026 · Full page →

PVA Postponed VAT accountingUK VAT-registered importers can account for import VAT on their VAT return instead of paying it at the border.

Customs & documents

UK VAT-registered importers can account for import VAT on their VAT return instead of paying it at the border.

With PVA, no import VAT is paid when the container is cleared.

Related: Duty Duty deferment

Read the import and export basics →

Source: GOV.UK · checked 27 Oct 2026 · Full page →

PWHPD Per workable hatch per dayA laytime rate per workable hatch.

Chartering

A laytime rate per workable hatch. Laytime depends on the hold with the most cargo, so a ship with one large hold takes longer.

If the largest hold has 8,000 t and the rate is 1,000 t PWHPD with one hatch, laytime is 8 days.

Related: PHPD Laytime

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

PWWD Per weather working dayA loading or discharge rate per weather working day.

Chartering

A loading or discharge rate per weather working day.

"Discharge 6,000 MT PWWD SHEX".

Related: WWD PHPD

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

Q

Quay Quay or wharfA solid structure along the shore where ships moor and cargo is handled.

Breakbulk & ports

A solid structure along the shore where ships moor and cargo is handled. A quay usually runs parallel to the shoreline.

The quay is rated for 15 t/m², enough for a heavy crawler crane.

Related: Berth Apron

Source: Port of Brownsville; Port of Tauranga · checked 27 Oct 2026 · Full page →

R

Recap Fixture recapA written summary of everything agreed in a charter negotiation, sent to both sides when the deal is done.

Chartering

A written summary of everything agreed in a charter negotiation, sent to both sides when the deal is done. The charter party is drawn up from it, so check it line by line.

The broker's recap lists the ship, cargo, laycan, freight, demurrage and "otherwise as per GENCON 1994".

Related: Fixture Charter party

Source: The Baltic Exchange; The Shipowners' Club · checked 27 Oct 2026 · Full page →

Redelivery End of a time charterThe charterer hands the ship back to the owner at the agreed place or range, and hire stops.

Chartering

The charterer hands the ship back to the owner at the agreed place or range, and hire stops. Charters require notices before redelivery: approximate ones first, then definite ones.

"Redelivery 1 safe port Skaw–Passero, 20/15/10/7 days' approximate and 5/3/2/1 days' definite notice."

Related: Hire Time charter

Source: West of England P&I Club; HandyBulk · checked 27 Oct 2026 · Full page →

Reefer Refrigerated containerA container with its own refrigeration unit that keeps cargo at a set temperature, chilled or frozen.

Containers

A container with its own refrigeration unit that keeps cargo at a set temperature, chilled or frozen. It needs power on the ship, at the terminal and on the road.

Chilled meat shipped at -1.5 °C in a 40' high-cube reefer.

Related: High cube

Source: Shapiro; Port of Tauranga; Port of Brownsville · checked 27 Oct 2026 · Full page →

Regulated agent RA (UK aviation security)A forwarder or handler approved to apply security controls, such as screening, to air cargo before it goes to the…

Air freight

A forwarder or handler approved to apply security controls, such as screening, to air cargo before it goes to the airline.

Cargo from an unknown shipper is screened by the regulated agent before acceptance.

Related: Known consignor

Source: UK Civil Aviation Authority · checked 27 Oct 2026 · Full page →

Reversible Reversible laytimeThe charterer may add the loading and discharge laytime together into one total.

Chartering

The charterer may add the loading and discharge laytime together into one total. Time saved at the loading port can be used at the discharge port.

"6 days reversible": using 2 days to load leaves 4 to discharge.

Related: Laytime Average laytime Non-reversible

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Rolled cargo Rolled or rolled overCargo that misses its booked sailing and is moved to a later one.

Containers

Cargo that misses its booked sailing and is moved to a later one. Common causes are overbooking, late or wrong paperwork, customs holds and port congestion.

Booked on the week 46 sailing, rolled to week 47: arrival slips by 7 days.

Related: Blank sailing

Source: DP World glossary · checked 27 Oct 2026 · Full page →

RORO Roll on, roll offCargo is driven or towed on and off the ship over a ramp, on its own wheels or on trailers or SPMTs.

Project & heavy lift

Cargo is driven or towed on and off the ship over a ramp, on its own wheels or on trailers or SPMTs.

A 90 t crawler crane drives up the stern ramp of a ro-ro ship.

Related: LOLO FLO-FLO

Source: Port of Tauranga; Port of Brownsville; Skuld · checked 27 Oct 2026 · Full page →

Rules of origin Tests for where goods come fromThe tests that decide whether goods count as made in a country under a trade deal, and so qualify for a lower or…

Customs & documents

The tests that decide whether goods count as made in a country under a trade deal, and so qualify for a lower or zero duty rate. Goods qualify if wholly obtained there, or worked enough to meet the product-specific rule.

Steel tube made in the UK from imported billet must meet the product-specific rule for its code to enter the EU at the preferential rate.

Related: COO Duty

Source: GOV.UK · checked 27 Oct 2026 · Full page →

Running days Consecutive daysDays that follow one after another, with no days left out for weekends, holidays or weather.

Chartering

Days that follow one after another, with no days left out for weekends, holidays or weather. Running hours work the same way.

"Laytime 5 running days": Sundays and rain days still count.

Related: Laytime WWD SHINC

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

S

SDS Safety data sheet (MSDS)The manufacturer's sheet on a product's hazards and safe handling.

Dangerous goods

The manufacturer's sheet on a product's hazards and safe handling. Section 14 gives the transport information, including the UN number.

Ask the supplier for the SDS before booking an unknown chemical.

Related: UN number DG

Read the DG by sea guide →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

Sea waybill SWBA non-negotiable transport document for sea cargo.

Customs & documents

A non-negotiable transport document for sea cargo. The named consignee can collect the goods with proof of identity, without presenting an original.

Goods shipped between two companies in the same group often go on a sea waybill.

Related: B/L

Source: Azmi & Associates, via AmCham Malaysia · checked 27 Oct 2026 · Full page →

Segregation DG segregationKeeping incompatible dangerous goods apart so they cannot react, such as acids from alkalis.

Dangerous goods

Keeping incompatible dangerous goods apart so they cannot react, such as acids from alkalis. The IMDG Code uses four levels, from "away from" to "separated longitudinally by an intervening compartment".

An oxidiser and a flammable liquid that need segregation must not share a container.

Related: IMDG Code Packing certificate

Read the DG by sea guide →

Source: Lashed & Secured; Exis Technologies · checked 27 Oct 2026 · Full page →

Semi-submersible Semi-sub heavy transport shipA heavy transport ship that can sink its deck below the water to float cargo on and off.

Project & heavy lift

A heavy transport ship that can sink its deck below the water to float cargo on and off. It also loads by skidding or rolling.

A 20,000 t module carried on a semi-sub needs a marine warranty surveyor's approval.

Related: FLO-FLO MWS HEAVYCON

Source: Skuld · checked 27 Oct 2026 · Full page →

Shackle Bow or dee shackleA U-shaped steel body closed by a pin, used to join slings, chains and fittings to a load or hook.

Project & heavy lift

A U-shaped steel body closed by a pin, used to join slings, chains and fittings to a load or hook. Dee shackles join two items; bow shackles take more than one attachment. Its WLL must be at least the load it will carry.

A bolt-type shackle with nut and split pin is chosen where a screw pin could work loose or the shackle cannot be watched.

Related: Sling WLL SWL

Source: LEEA · checked 27 Oct 2026 · Full page →

SHEX Sundays and holidays excludedSundays and holidays do not count as laytime.

Chartering

Sundays and holidays do not count as laytime. Check whether "unless used" or "even if used" is added.

"Discharge 5,000 MT per WWD SHEX UU".

Related: SHINC SSHEX FHEX UU

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

SHINC Sundays and holidays includedSundays and holidays count as laytime like any other day.

Chartering

Sundays and holidays count as laytime like any other day.

"Load 8,000 MT per day SHINC" means seven days a week.

Related: SHEX SSHINC Laytime

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

Shipped on board Shipped B/L and on-board dateA bill of lading that shows the goods are actually loaded on the named ship, with the date.

Customs & documents

A bill of lading that shows the goods are actually loaded on the named ship, with the date. A "received for shipment" B/L only shows the carrier has the goods. Letters of credit often call for a shipped-on-board B/L.

For containers, the on-board date is when the last box on that B/L is loaded.

Related: B/L

Source: DP World glossary; ZIM · checked 27 Oct 2026 · Full page →

Shipper ConsignorThe party that sends the goods and arranges their carriage with the carrier.

Customs & documents

The party that sends the goods and arranges their carriage with the carrier. It is named as shipper on the bill of lading or waybill.

The UK manufacturer is shipper on the house B/L; its forwarder is shipper on the line's master B/L.

Related: Consignee Notify party B/L House B/L

Source: Port of Tauranga; Port of Brownsville; ZIM · checked 27 Oct 2026 · Full page →

Ship's agent Port agentA local company that arranges a ship's port call for the owner or charterer: berth, pilots, tugs, customs, crew and…

Breakbulk & ports

A local company that arranges a ship's port call for the owner or charterer: berth, pilots, tugs, customs, crew and paperwork.

The agent sends the statement of facts after departure.

Related: NOR

Source: Port of Tauranga; Port of Brownsville · checked 27 Oct 2026 · Full page →

Skeletal trailer Container chassisA trailer that is just a chassis frame fitted with twistlocks for carrying containers or swap bodies.

Road

A trailer that is just a chassis frame fitted with twistlocks for carrying containers or swap bodies. Sliding types extend to carry 20', 30', 40' and 45' boxes.

A sliding skeletal carries a 20' at the rear so it can be tipped out through its back doors.

Related: Twistlock Swap body Haulier

Source: PIARC; Society of Operations Engineers; Port of Brownsville · checked 27 Oct 2026 · Full page →

SLI Shipper's letter of instructionThe shipper's written instructions to the forwarder on how to ship, document and clear a consignment.

Air freight

The shipper's written instructions to the forwarder on how to ship, document and clear a consignment.

The SLI says "deliver to consignee, duties paid by receiver, insure for £40,000".

Related: Freight forwarder

Source: DP World glossary · checked 27 Oct 2026 · Full page →

Sling Lifting slingA chain, wire rope or textile sling that connects a load to the crane hook.

Project & heavy lift

A chain, wire rope or textile sling that connects a load to the crane hook. It is a lifting accessory, so it must be marked with its safe working load and thoroughly examined at least every 6 months, or at the intervals set in an examination scheme drawn up by a competent person.

A 4-leg chain sling is tagged with its WLL and its last thorough examination date.

Related: Shackle WLL SWL

Source: Health and Safety Executive; Skuld · checked 27 Oct 2026 · Full page →

SOLAS International Convention for the Safety of Life at SeaThe main IMO treaty on ship safety.

Containers

The main IMO treaty on ship safety. Its chapter VI, regulation 2 is where the VGM rule comes from.

The VGM rule has applied under SOLAS since 1 July 2016.

Related: VGM IMDG Code

Read the VGM guide →

Source: IMO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

Special Order Special Order (BE16)Individual permission for the largest road moves: over 150,000 kg gross, over 16,500 kg on an axle, over 6.1 m wide…

Road

Individual permission for the largest road moves: over 150,000 kg gross, over 16,500 kg on an axle, over 6.1 m wide or over 30 m rigid length. Apply at least 10 weeks ahead.

A 400 t stator move from port to power station needs a Special Order.

Related: STGO VR1 ESDAL AIL

Source: National Highways; GOV.UK · checked 27 Oct 2026 · Full page →

S&S GB Safety and Security Great BritainHMRC's system for entry summary declarations for goods arriving in Great Britain.

Customs & documents

HMRC's system for entry summary declarations for goods arriving in Great Britain.

A ferry operator files ENS data in S&S GB for unaccompanied trailers.

Related: ENS ICS2

Source: GOV.UK · checked 27 Oct 2026 · Full page →

SSHEX Saturdays, Sundays and holidays excludedSaturdays, Sundays and holidays do not count as laytime.

Chartering

Saturdays, Sundays and holidays do not count as laytime. Also written SATSHEX.

A Friday-evening arrival under SSHEX may not start counting laytime until Monday.

Related: SHEX SSHINC

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

SSHINC Saturdays, Sundays and holidays includedEvery day counts as laytime, weekends and holidays included.

Chartering

Every day counts as laytime, weekends and holidays included. Also written SATSHINC.

"Laytime 4 days SSHINC" runs straight through the weekend.

Related: SHINC SSHEX

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

Stability Ship stabilityA ship's ability to stay upright and return to upright.

Project & heavy lift

A ship's ability to stay upright and return to upright. Heavy lifts with the ship's cranes change stability, so it must be calculated for every stage.

The ship takes on ballast before swinging a 300 t piece outboard.

Related: Ballast

Source: Skuld · checked 27 Oct 2026 · Full page →

Stevedore Stevedoring company or dockerThe company or workers who load and unload ships and secure cargo on board.

Breakbulk & ports

The company or workers who load and unload ships and secure cargo on board.

The stevedores lash the pieces on deck before the ship sails.

Related: Gang Tally BT-BT

Source: Port of Tauranga; Port of Brownsville; MOL Logistics · checked 27 Oct 2026 · Full page →

STF Standard tension forceThe tension a ratchet puts into a web lashing when pulled with the standard hand force of 50 daN, as marked on the…

Project & heavy lift

The tension a ratchet puts into a web lashing when pulled with the standard hand force of 50 daN, as marked on the label. It is the figure that counts for top-over lashing; the LC is not.

A strap marked "STF 400 daN" holds about 400 daN of tension when tightened by hand; the real tension can be higher or lower.

Related: LC Tie-down lashing Pre-tension

Open the Load Planner →

Source: European Commission, DG MOVE; Dolezych · checked 27 Oct 2026 · Full page →

STGO Special Types General OrderThe GB order letting abnormal loads move without individual permission, within categories by weight: Category 1 up…

Road

The GB order letting abnormal loads move without individual permission, within categories by weight: Category 1 up to 46 t (50 t on 6 axles), Category 2 up to 80 t, Category 3 up to 150 t.

A 120 t gross move is STGO Category 3: 5 working days' notice to road and bridge authorities.

Related: AIL Special Order ESDAL Axle load

Source: GOV.UK; National Highways · checked 27 Oct 2026 · Full page →

Stowage plan Cargo planA drawing showing where each piece of cargo is stowed on the ship, by hold, deck and position.

Project & heavy lift

A drawing showing where each piece of cargo is stowed on the ship, by hold, deck and position.

The stowage plan shows the 3 transformers on the tank top of hold 2.

Related: Tween deck Lashing

Open the Load Planner →

Source: MOL Logistics · checked 27 Oct 2026 · Full page →

Stripping Unpacking a container (devanning)Taking cargo out of a container, at a freight station or the consignee's premises.

Containers

Taking cargo out of a container, at a freight station or the consignee's premises.

The LCL box is stripped at the CFS and pallets go out for delivery.

Related: Stuffing CFS

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

Stuffing Packing a containerLoading cargo into a container.

Containers

Loading cargo into a container. The opposite, unpacking, is stripping (devanning).

"Stuffing at shipper's premises, 25 Nov."

Related: Stripping CFS CTU Code

Open the Load Planner →

Source: Port of Brownsville; IMO, ILO and UNECE · checked 27 Oct 2026 · Full page →

Subjects lifted Subs lifted: the deal is firmBoth sides confirm that every subject has been met or dropped.

Chartering

Both sides confirm that every subject has been met or dropped. Only then is the fixture binding; a deal with no open subjects is called "clean fixed".

"Subs lifted 15:00 London, vessel fixed clean."

Related: Fixture Recap

Source: The Baltic Exchange; The Shipowners' Club · checked 27 Oct 2026 · Full page →

Subsidiary hazard Secondary hazardA second hazard a substance has on top of its main class, shown by an extra label.

Dangerous goods

A second hazard a substance has on top of its main class, shown by an extra label.

A flammable liquid that is also toxic carries class 3 and 6.1 labels.

Related: DG class

Read the DG by sea guide →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

Swap body Exchangeable container (swap body)A load unit like a container but built for road and rail, with legs so it can stand while the truck drives away.

Road

A load unit like a container but built for road and rail, with legs so it can stand while the truck drives away.

A parcel firm swaps bodies at the depot so trucks keep moving.

Related: CTU

Source: IMO, ILO and UNECE · checked 27 Oct 2026 · Full page →

Switch B/L Switch bill of ladingA new set of bills of lading issued to replace the originals, for example to hide the supplier or change the…

Customs & documents

A new set of bills of lading issued to replace the originals, for example to hide the supplier or change the discharge port. The full original set should be handed back first.

A trader switches the B/L so the buyer does not see the factory's name.

Related: B/L LOI

Source: West of England P&I Club · checked 27 Oct 2026 · Full page →

SWL Safe working loadThe load a lifting item may lift in its conditions of use.

Project & heavy lift

The load a lifting item may lift in its conditions of use. It is usually the same as the WLL, but a competent person may set it lower for harsh conditions.

A competent person may set the SWL of a 17 t shackle lower than its marked WLL for harsh offshore use.

Related: WLL MSL

Source: LEEA; The Baltic Exchange · checked 27 Oct 2026 · Full page →

T

TAD Transit accompanying documentThe printed document with the transit MRN that travels with goods under transit.

Customs & documents

The printed document with the transit MRN that travels with goods under transit.

The driver carries the TAD and presents it at the office of destination.

Related: Transit NCTS

Source: GOV.UK · checked 27 Oct 2026 · Full page →

Tally TallyingCounting and checking cargo pieces and their condition as they are loaded or discharged.

Breakbulk & ports

Counting and checking cargo pieces and their condition as they are loaded or discharged. A tally clerk (checker) records shortages and damage.

The tally shows 148 of 150 bundles loaded; two are short-shipped.

Related: Stevedore Manifest

Source: MOL Logistics; Port of Brownsville · checked 27 Oct 2026 · Full page →

Tank top Bottom of the holdThe floor of the lowest hold, which is the top of the double-bottom tanks.

Project & heavy lift

The floor of the lowest hold, which is the top of the double-bottom tanks. It has a rated strength that heavy cargo must not exceed.

A 200 t piece on the tank top needs grillage to spread its load within the rated t/m².

Related: Tween deck

Open the Load Planner →

Source: Skuld · checked 27 Oct 2026 · Full page →

Tare Tare weightThe weight of the empty container.

Containers

The weight of the empty container. It is printed on the doors and is part of the verified gross mass.

A 40' HC with a tare of about 3,900 kg.

Related: Payload Max gross VGM

Open the VGM calculator →

Source: Shapiro; Port of Tauranga · checked 27 Oct 2026 · Full page →

Temporary admission TA: relief for goods that will be re-exportedA UK customs procedure for bringing goods in for a limited time and re-exporting them, with full or partial relief…

Customs & documents

A UK customs procedure for bringing goods in for a limited time and re-exporting them, with full or partial relief from import duty and VAT. It needs authorisation, and time limits depend on the goods, up to 24 months in most cases.

Test equipment comes in for a 3-month demonstration under temporary admission, then goes back out.

Related: ATA Carnet Customs declaration Duty

Read the ATA Carnet guide →

Source: GOV.UK · checked 27 Oct 2026 · Full page →

TEU Twenty-foot equivalent unitThe standard way to count containers and ship sizes.

Containers

The standard way to count containers and ship sizes. A 20' container is 1 TEU and a 40' is 2 TEU.

A 24,000 TEU ship can carry about 12,000 forty-foot containers, before weight limits.

Related: FEU Twenty-foot Forty-foot

See the container guide →

Source: Port of Tauranga; Port of Brownsville; The Baltic Exchange · checked 27 Oct 2026 · Full page →

THC Terminal handling chargeThe charge for handling a container at the port terminal, from the stack to the ship or back.

Surcharges

The charge for handling a container at the port terminal, from the stack to the ship or back. OTHC is at origin, DTHC at destination, usually in local currency.

DTHC at Felixstowe is billed to the consignee in pounds.

Related: CAF Incoterms

Source: Marine Insight · checked 27 Oct 2026 · Full page →

Tie-down lashing Top-over or friction lashingLashings passed over the top of the cargo and tensioned, pressing it down so friction stops it sliding.

Project & heavy lift

Lashings passed over the top of the cargo and tensioned, pressing it down so friction stops it sliding. It depends on the tension and the friction, not on the lashing's LC.

Top-over straps on crates standing on rubber mats: the strap tension and the mats do the work.

Related: Direct lashing STF Friction Pre-tension

Open the Load Planner →

Source: European Commission, DG MOVE · checked 27 Oct 2026 · Full page →

Time charter TC: hire of a ship for a periodThe charterer hires the ship for a period and decides where it trades.

Chartering

The charterer hires the ship for a period and decides where it trades. The owner still crews and maintains it. The charterer pays hire per day and usually pays for fuel and port costs.

A 12-month time charter at US$14,500 per day, delivered Singapore.

Related: Hire Bareboat charter

Source: The Baltic Exchange; Marine Insight; Azmi & Associates, via AmCham Malaysia · checked 27 Oct 2026 · Full page →

Tramp shipping Ships with no fixed route or scheduleShips that go wherever a cargo takes them, hired under a charter for a voyage or a period.

Chartering

Ships that go wherever a cargo takes them, hired under a charter for a voyage or a period. Most bulk, breakbulk and project cargo moves this way.

An MPP is fixed for one heavy-lift voyage from Bilbao to Freeport, then fixed again from there.

Related: Liner service Voyage charter Time charter Charter party

Source: Port of Brownsville; Marine Insight · checked 27 Oct 2026 · Full page →

Transhipment T/SMoving cargo from one ship to another at an intermediate port on the way to its destination.

Containers

Moving cargo from one ship to another at an intermediate port on the way to its destination.

Felixstowe to Mombasa via transhipment at Salalah.

Related: Feeder Hub port

Read the shipping guides →

Source: Port of Tauranga; Port of Brownsville · checked 27 Oct 2026 · Full page →

Transit Customs transit (common transit)Moving goods under customs control, with duty suspended, from an office of departure to an office of destination.

Customs & documents

Moving goods under customs control, with duty suspended, from an office of departure to an office of destination.

Goods landed at Rotterdam move in transit to a UK inland clearance depot.

Related: NCTS TAD

Source: GOV.UK · checked 27 Oct 2026 · Full page →

Transit shed Port shedA covered store at the quay for short-term, weather-protected storage of cargo between ship and land transport.

Breakbulk & ports

A covered store at the quay for short-term, weather-protected storage of cargo between ship and land transport.

Paper reels kept in the transit shed until the trucks arrive.

Related: Apron

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

Turn time TT: notice time before laytime startsThe period after notice of readiness before laytime starts to count.

Chartering

The period after notice of readiness before laytime starts to count. It gives the receiver time to prepare.

"Laytime to commence 12 hours after NOR tendered, unless sooner commenced."

Related: NOR Laytime USC

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

Tween deck TW: 'tween deckAn intermediate deck inside the hold, splitting it into upper and lower spaces.

Project & heavy lift

An intermediate deck inside the hold, splitting it into upper and lower spaces. It gives more flexible stowage, but its strength limit (t/m²) must be checked for heavy cargo.

Crates stowed on the tween deck, steel on the tank top below.

Related: Tank top

Source: The Baltic Exchange; MOL Logistics · checked 27 Oct 2026 · Full page →

Twenty-foot 20' container (20GP, 22G1)The standard 20' general-purpose box, about 6.06 m long, 2.44 m wide and 2.59 m high outside.

Containers

The standard 20' general-purpose box, about 6.06 m long, 2.44 m wide and 2.59 m high outside. Good for heavy, dense cargo, because it fills up by weight first.

Steel fittings at 21 t fill a 20' by weight while using half its volume.

Related: Forty-foot TEU Tare Payload

Try Will it fit? →

Source: Shapiro; Port of Tauranga · checked 27 Oct 2026 · Full page →

Twistlock Container locking deviceA turning lock that fits into a container's corner castings to hold it to a ship's deck, a trailer or the box below.

Containers

A turning lock that fits into a container's corner castings to hold it to a ship's deck, a trailer or the box below. HSE warns that securing twistlocks are not lifting gear and must never be used as such.

The driver turns and locks the skeletal trailer's twistlocks before leaving the terminal.

Related: Corner casting Skeletal trailer Lashing

Source: Health and Safety Executive; Society of Operations Engineers · checked 27 Oct 2026 · Full page →

U

UK ETS UK Emissions Trading Scheme for maritimeFrom 1 July 2026 the UK ETS covers ships of 5,000 GT and above on domestic UK voyages and at berth in UK ports.

Surcharges

From 1 July 2026 the UK ETS covers ships of 5,000 GT and above on domestic UK voyages and at berth in UK ports. Carriers differ on whether they pass it on.

One carrier adds an emissions surcharge for UK cargo; another says the cost is too small to charge.

Related: EU ETS surcharge

Read the bunker surcharge guide →

Source: GOV.UK; Lashed & Secured · checked 27 Oct 2026 · Full page →

ULD Unit load deviceAn airline pallet or container shaped to fit the aircraft's hold.

Air freight

An airline pallet or container shaped to fit the aircraft's hold. Cargo is built up on or in ULDs before loading.

Ten pallets of parts built up on two PMC pallets for a 777 freighter.

Related: LD3 PMC PAG

Try Will it fit? (aircraft and ULDs) →

Source: DSV; Röhlig Logistics · checked 27 Oct 2026 · Full page →

UN number UN identification numberA four-digit number that identifies a dangerous substance or article in transport.

Dangerous goods

A four-digit number that identifies a dangerous substance or article in transport. It is found in section 14 of the safety data sheet.

UN 1263 is paint; UN 3480 is lithium-ion batteries on their own.

Related: PSN DG class Packing group SDS

Read the DG by sea guide →

Source: Exis Technologies; Lashed & Secured · checked 27 Oct 2026 · Full page →

UN packaging UN-specification packagingPackaging tested and certified for dangerous goods, marked with the UN symbol and a code.

Dangerous goods

Packaging tested and certified for dangerous goods, marked with the UN symbol and a code. X, Y or Z in the code shows which packing groups it may be used for.

4G/Y25/S/26/GB: a fibreboard box approved for PG II and III.

Related: Packing group

Read the DG by sea guide →

Source: Lashed & Secured · checked 27 Oct 2026 · Full page →

USC Unless sooner commencedIf cargo work starts during the turn time, laytime starts then instead of waiting for the turn time to end.

Chartering

If cargo work starts during the turn time, laytime starts then instead of waiting for the turn time to end.

Loading starts 4 hours after NOR. Under USC, laytime starts then, not after 12 hours.

Related: Turn time Laytime UU

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

UU Unless usedExcepted periods, such as Sundays, do not count as laytime unless cargo work is actually done in them.

Chartering

Excepted periods, such as Sundays, do not count as laytime unless cargo work is actually done in them. If it is, the time used counts.

"SHEX UU": if the stevedores work on Sunday, those hours count.

Related: SHEX Laytime UUIWCATUTC

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

UUIWCATUTC Unless used, in which case actual time used to countSpells out UU fully: excepted periods only count when worked, and then only for the hours actually worked.

Chartering

Spells out UU fully: excepted periods only count when worked, and then only for the hours actually worked.

Six hours of Sunday work count as six hours of laytime.

Related: UU ATUTC Laytime

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

V

VGM Verified gross massThe weighed total of a packed container: cargo, packing, dunnage, securing and the box's tare.

Containers

The weighed total of a packed container: cargo, packing, dunnage, securing and the box's tare. Under SOLAS, a packed container can't be loaded on a ship without it.

A 40' HC with 22,000 kg of cargo and 3,900 kg tare has a VGM of about 25,900 kg.

Related: Tare SOLAS Max gross

Open the VGM calculator →

Source: IMO; GOV.UK · checked 27 Oct 2026 · Full page →

VLSFO Very low sulphur fuel oilShip fuel with no more than 0.50% sulphur, the standard fuel since the IMO 2020 limit.

Surcharges

Ship fuel with no more than 0.50% sulphur, the standard fuel since the IMO 2020 limit. Its price drives BAF.

VLSFO prices in Singapore and Rotterdam feed into quarterly BAF.

Related: BAF LSS Bunkers

Read the bunker surcharge guide →

Source: Lashed & Secured; Maersk · checked 27 Oct 2026 · Full page →

Volumetric weight Dimensional weightA weight worked out from the size of a package.

Air freight

A weight worked out from the size of a package. For air freight: length × width × height in cm, divided by 6,000. Couriers often divide by 5,000.

120 × 80 × 100 cm = 960,000 cm³ ÷ 6,000 = 160 kg volumetric weight.

Related: Chargeable weight

Work out chargeable weight →

Source: Maersk · checked 27 Oct 2026 · Full page →

Voyage charter Hire of a ship for a voyageThe owner carries an agreed cargo between named ports for a freight rate, per tonne or as a lump sum.

Chartering

The owner carries an agreed cargo between named ports for a freight rate, per tonne or as a lump sum. The owner runs the ship and pays its costs; the charterer pays freight and any demurrage.

A voyage charter for 45,000 t of grain from Rouen to Alexandria at US$32 per tonne.

Related: Charter party Time charter Laytime Demurrage

Source: Marine Insight; Azmi & Associates, via AmCham Malaysia · checked 27 Oct 2026 · Full page →

VR1 VR1 permit (wide loads)Permission from National Highways (for the Secretary of State) to move a load over 5.0 m and up to 6.1 m wide.

Road

Permission from National Highways (for the Secretary of State) to move a load over 5.0 m and up to 6.1 m wide. Apply at least 2 weeks ahead.

A 5.4 m wide vessel needs a VR1 plus 2 clear working days' notice to police.

Related: AIL Special Order ESDAL

Source: National Highways; GOV.UK · checked 27 Oct 2026 · Full page →

W

Wharfage Wharfage feeA charge by the port or wharf owner on cargo passing over the quay, usually per tonne or per unit.

Breakbulk & ports

A charge by the port or wharf owner on cargo passing over the quay, usually per tonne or per unit.

Wharfage charged per tonne of steel crossing the quay.

Related: Dockage

Source: Port of Brownsville · checked 27 Oct 2026 · Full page →

WIFPON Whether in free pratique or notNotice of readiness can be given before the port health authority has cleared the ship.

Chartering

Notice of readiness can be given before the port health authority has cleared the ship. Clearance is usually expected to follow without delay.

A ship arriving at night gives NOR WIFPON and gets free pratique the next morning.

Related: Free pratique NOR

Source: The Baltic Exchange; BIMCO · checked 27 Oct 2026 · Full page →

WLL Working load limitThe maximum load the manufacturer rates a lifting item for, in ideal conditions.

Project & heavy lift

The maximum load the manufacturer rates a lifting item for, in ideal conditions. Never exceed it.

A chain sling marked WLL 10 t must never lift more than 10 t, and its rating drops when the legs are used at an angle.

Related: SWL MSL

Source: LEEA · checked 27 Oct 2026 · Full page →

WP Weather permittingTime when the weather stops cargo work does not count as laytime.

Chartering

Time when the weather stops cargo work does not count as laytime. Under the BIMCO definitions, "working day weather permitting" means the same as a weather working day of 24 consecutive hours.

"Laytime 72 hours WP": two hours of heavy rain stop the clock for two hours.

Related: WWD Laytime

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

WTS Working time saved (also LTS, laytime saved)Despatch counted only on the laytime saved, leaving out excepted periods such as Sundays and holidays.

Chartering

Despatch counted only on the laytime saved, leaving out excepted periods such as Sundays and holidays. It usually pays less than all time saved.

Finishing Friday evening with laytime ending Monday: WTS does not count Sunday.

Related: ATS Despatch SHEX

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

WWD Weather working dayA working day, or part of one, when the weather allows cargo work.

Chartering

A working day, or part of one, when the weather allows cargo work. Time lost to bad weather does not count as laytime.

"5,000 MT per WWD": a day of heavy rain on a grain cargo does not count.

Related: WP PWWD Laytime SHEX

Source: BIMCO; The Baltic Exchange · checked 27 Oct 2026 · Full page →

WWD of 24 consecutive hours Weather working day of 24 consecutive hoursEach working day counts as a laytime day of 24 hours, and the actual time lost to weather is taken off, whenever it…

Chartering

Each working day counts as a laytime day of 24 hours, and the actual time lost to weather is taken off, whenever it happens.

Rain stops work for 6 hours one night: 6 hours come off that day's laytime.

Related: WWD Laytime

Source: BIMCO · checked 27 Oct 2026 · Full page →

Last checked 27 Oct 2026. Next check January 2027. Meanings can differ by trade and contract: always check the wording of your own charter party, booking or contract. Information only: we don't quote, book or arrange freight.