Laytime Time allowed to load or discharge
The time the owner gives the charterer to load or discharge, with no extra payment beyond freight. If it runs out, demurrage starts. If cargo work finishes early, despatch may be due.
Example
"Laytime 3 WWD SHEX" means three weather working days, Sundays and holidays excluded.
Related terms
- Laycan Laydays and cancelling (dates)
- Demurrage DEM: charter party demurrage
- Despatch DES: despatch money
- NOR Notice of readiness
Often mixed up
- Laycan vs laytime When the ship must arrive, and how long cargo work may take
- Charter vs container demurrage One word, two different charges
Sources
- Laytime Definitions for Charter Parties 2013, BIMCO (bimco.org). Opened 26 Oct 2026.
- A glossary of shipping related terms, The Baltic Exchange (balticexchange.com). Opened 26 Oct 2026.
Checked 27 Oct 2026 · next check January 2027. Meanings can differ by trade and contract: check your own documents.
