Out-of-gauge cargo

Laycan Laydays and cancelling (dates)

Chartering

The window of dates in which the ship must arrive at the loading port, ready to load. If it is late, the charterer may cancel the charter.

Example

"Laycan 10–15 May" means the ship must be ready to load between 10 and 15 May.

Good to know: MOL Logistics expands it as "laytime cancelling"; the Baltic Exchange says "laydays and cancelling dates". The meaning is the same.