Out-of-gauge cargo

Pre-tension Initial tension in a lashing

Project & heavy lift

The tension put into a lashing when it is tightened, before the journey loads it. EU guidance says no more than half the LC. Tension can drop on soft cargo, so lashings are checked and re-tightened.

Example

On a soft, wrapped load, strap tension can fall to half or less, so the driver checks and re-tightens.

Open the Load Planner →

Related terms

Sources

Checked 27 Oct 2026 · next check January 2027. Meanings can differ by trade and contract: check your own documents.