LASHED & SECURED3D load planning
Out-of-gauge cargo

Tween deck TW: 'tween deck

Project & heavy lift

An intermediate deck inside the hold, splitting it into upper and lower spaces. It gives more flexible stowage, but its strength limit (t/m²) must be checked for heavy cargo.

Example

Crates stowed on the tween deck, steel on the tank top below.

Related terms

Sources

Checked 27 Oct 2026 · next check January 2027. Meanings can differ by trade and contract: check your own documents.

← All shipping terms