LASHED & SECURED3D load planning
Out-of-gauge cargo

Tank top Bottom of the hold

Project & heavy lift

The floor of the lowest hold, which is the top of the double-bottom tanks. It has a rated strength that heavy cargo must not exceed.

Example

A 200 t piece on the tank top needs grillage to spread its load within the rated t/m².

Open the Load Planner →

Related terms

Sources

Checked 27 Oct 2026 · next check January 2027. Meanings can differ by trade and contract: check your own documents.

← All shipping terms