Sling Lifting sling
A chain, wire rope or textile sling that connects a load to the crane hook. It is a lifting accessory, so it must be marked with its safe working load and thoroughly examined at least every 6 months, or at the intervals set in an examination scheme drawn up by a competent person.
Example
A 4-leg chain sling is tagged with its WLL and its last thorough examination date.
Related terms
Often mixed up
Sources
- Lifting equipment at work: a brief guide (INDG290 rev1, 2013), Health and Safety Executive (HSE) (hse.gov.uk). Opened 27 Oct 2026.
- Practice guidance for shipment of project and equipment cargoes (23 Aug 2022), Skuld (P&I club) (skuld.com). Opened 27 Oct 2026.
Checked 27 Oct 2026 · next check January 2027. Meanings can differ by trade and contract: check your own documents.
