LASHED & SECURED3D load planning
Out-of-gauge cargo

LDM Loading metre

Road

One metre of trailer floor length across the full width (about 2.4 m), so about 2.4 m² of floor. Road groupage is often charged per loading metre.

Example

Cargo covering 4.8 m² of floor uses about 2 LDM.

Open the Pallet Builder →

Sources

Checked 27 Oct 2026 · next check January 2027. Meanings can differ by trade and contract: check your own documents.

← All shipping terms