Gate in / gate out Container entering or leaving a terminal
Gate in is when a container enters a port, depot or inland terminal and is checked and recorded. Gate out is when it leaves after release. Both are standard tracking events, and they often start or stop the D&D clock.
Example
Full import gated out on 14 Nov, empty gated in at the depot on 20 Nov: 6 days with the customer.
Related terms
- EIR Equipment interchange receipt
- Demurrage (container) Container demurrage
- Detention Container detention
Often mixed up
Sources
- Gating in, DP World glossary (dpworld.com). Opened 27 Oct 2026.
- Gate out, DP World glossary (dpworld.com). Opened 27 Oct 2026.
- DCSA event code types, Vizion (DCSA event reference) (docs.vizionapi.com). Opened 27 Oct 2026.
- What is demurrage and detention in shipping? (28 Aug 2023), Maersk (maersk.com). Opened 26 Oct 2026.
Checked 27 Oct 2026 · next check January 2027. Meanings can differ by trade and contract: check your own documents.
