Stowage plan Cargo plan
A drawing showing where each piece of cargo is stowed on the ship, by hold, deck and position.
Example
The stowage plan shows the 3 transformers on the tank top of hold 2.
Open the Load Planner →Related terms
Sources
- What are BT-BT and FIO? Key terms for breakbulk shipping (10 Jul 2025), MOL Logistics (mol-logistics-group.com). Opened 26 Oct 2026.
Checked 27 Oct 2026 · next check January 2027. Meanings can differ by trade and contract: check your own documents.
