Two very different kinds of ship are being built right now. At one end are the 24,000 TEU ultra-large container ships that carry most of the world's boxes between Asia and Europe. At the other are the heavy-lift and multipurpose ships, with their own cranes, that move the transformers, modules and turbine parts that don't fit in a box. Both affect anyone moving project cargo.

Part 1: The 24,000 TEU class

How big is big?

The largest container ships are about 400 metres long and 61 metres wide, carrying around 24,000 twenty-foot equivalent units (TEU). The record is still held by MSC Irina, at 24,346 TEU, delivered in March 2023. Nothing delivered since has beaten her.

New ones keep arriving, though, and they're getting cleaner rather than bigger:

There's talk of going bigger again. Analysts at Alphaliner have revived the idea of a 27,500 TEU "Gigamax", but no carrier or yard has confirmed an order. Maersk, the one big carrier that never ordered a 24,000 TEU ship, ordered 18,600 TEU ships in 2026 instead, at 366 metres by 58.6 metres.

The orderbook

The order books are full. Alphaliner put the global containership orderbook at a record 14.7 million TEU across 1,795 ships on 9 September 2026, with ships over 10,000 TEU making up 68% of it. Linerlytica's later count, after Maersk's large order and a reported order for twelve 24,000 TEU ships by CMA CGM, was about 15.6 million TEU. That's around 45% of the ships already sailing. BIMCO expects fleet capacity to grow by about 9% in 2027.

Where can they go?

Not many places. A 24,000 TEU ship needs:

Suez Canal: yes. Ships of this size used Suez routinely before the Red Sea attacks. In September 2026 the 24,188 TEU OOCL Portugal made COSCO's first southbound transit since the crisis began, and Maersk, Hapag-Lloyd, MSC and CMA CGM have moved some services back. It's service by service and could be reversed, so check the routing of each booking.

Panama Canal: no. The Neopanamax locks take ships up to about 370 metres long and 51 metres wide, so the 400-metre class can't fit.

In practice they work the Asia–North Europe and Asia–Mediterranean trades, calling at the big hubs. In the UK, Felixstowe, London Gateway and Southampton are the ports that handle this class.

What it means for rates and congestion

Part 2: Heavy-lift ships, geared vs gearless

Geared ships

A geared ship carries its own cranes. On heavy-lift and multipurpose (MPP) ships these are serious machines, usually mounted on one side so two can work together in tandem. Here are some recent examples:

Gearless ships

A gearless ship has no cranes, or none heavy enough, and relies on what the port has. Container ships are gearless. So are semi-submersibles, which ballast down and float the cargo on or off, and ro-ro ships, which take cargo rolled on by SPMTs or trailers.

When do you need the ship's gear?

You need the ship's gear when:

Shore cranes or floating cranes can be the better choice when:

For scale, a Liebherr LHM 800 mobile harbour crane is rated at 308 tonnes on its own and 616 tonnes when two work in tandem. That's big, but well short of a modern heavy-lift ship's cranes.

How to check a port's crane capacity

The number on the brochure is the crane's maximum, usually at its shortest radius. What matters is what it can lift at the radius you actually need.

  1. Get the load chart. Ask the port, terminal or agent for the crane's load chart, which shows the safe working load (SWL) at each radius. Work out the radius from the crane's position to the centre of gravity of the piece, both on the quay and on the ship or barge.
  2. Add everything that hangs off the hook. The lift weight is the cargo plus slings, shackles, spreader or lifting beam, and the hook block if the chart doesn't include it.
  3. Check tandem rules. Two cranes in tandem don't simply add up. A tandem lift needs a plan that shares the load between them, and usually a derating margin.
  4. Check the quay. Ask for the quay's load bearing capacity (tonnes per square metre), as well as the crane's outrigger loads and the route for SPMTs or trailers.
  5. Check depth and berth. Ask for the draught at the berth at the state of tide you'll be working, and the berth length.
  6. Check availability and paperwork. Check the crane is free on your dates, is in date for its thorough examination, and comes with an operator. In the UK, lifts come under LOLER and BS 7121, so you'll need a lift plan from an appointed person.

Get those six answers in writing before you commit to a ship. They're what usually decides between a geared ship, a gearless ship plus a shore or floating crane, or a different port.

Sources

Ship data and orderbook figures were correct when checked in October 2026. Always confirm with the carrier or port before planning a lift.